My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005610 06.29.23 AECOM CAT PL.3, PL.4, PL.5, PL.6, PL.7
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
PL-INT-2023-005610 06.29.23 AECOM CAT PL.3, PL.4, PL.5, PL.6, PL.7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 1:13:50 PM
Creation date
8/29/2023 9:12:19 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005610
Description
AECOM, PROFESSIONAL SERVICES FOR CAT PL.3, PL.4, PL.5, PL.6, PL.7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> Christopher(Chris)Stoll 19.RELEVANT PROJECTS(continued) <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hawaii Interisland Renewable Energy Program (HIREP) EIS PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Hawaii) 2010-2013 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> GIS Lead/Planner for AECOM who was contracted by the State of Hawaii, Department of Business, Economics, Development,and Tourism <br /> (DBEDT),to prepare an EIS for a proposed electrical undersea transmission line to connect the central Hawaiian Islands(Oahu, Molokai, Lanai, <br /> and Maui)for the purposes of transmitting power from renewable energy collection areas to area of demand.The initial phase of this project <br /> focused on wind energy resources on Molokai, Lanai,and Maui and connecting them via the undersea cable to the island of Oahu.This project <br /> made use of GIS to support alternative analysis and selection,document production,and provided graphic support for client meetings and <br /> meetings with the public. <br /> e. (1)TITLE AND LOCATION(City and State) See Project#10 in Section (2)YEAR COMPLETED <br /> Kapiolani Regional Park Recreation Capacity Study PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Hawaii) 2011 -2012 N/A <br /> (3)BRIE DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Project Manager as part of a team working with the City&County of Honolulu and park staff to conduct a year-long survey on park usage and <br /> visitor experience.The survey included an in-park visitor survey,online survey,and observational survey.This information along with records <br /> research and other assessments were provided in a report with recommendations on how to improve user experience for this premiere park at the <br /> base of Diamondhead Crater and urban edge of Waikiki on the island of Oahu. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE E-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.