Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME �,. 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> A.TOTAL B.WITH CURRENT FIRM <br /> Bonnie Grubb, NCIDQ, LEED AP Planner/Graphic Technician 16 8 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> AECOM Technical Services, Inc.(Honolulu, Hawaii) <br /> 16.EDUCATION 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS, Interior Design, University of Cincinnati National Council for Interior Design Qualification(NCIDQ) <br /> LEED Accredited Professional <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> Bonnie Grubb is a Planner and Graphics Technician in the Planning, Design,and Development group in AECOM's Honolulu office.She specializes in <br /> technical graphics and assists lead planners in developing planning reports and 3D visualizations for various planning projects within the state with a <br /> focus on community involvement and engagement. Prior to AECOM,she was a junior planner with Kimura International, Inc. <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) See Project#1 in Section F (2)YEAR COMPLETED <br /> CCH, DES, Blaisdell Center Master Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2018 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Planner and Graphic Technician on the$4,190,469 project that involved the development of a conceptual plan for the 22-acre site in Honolu- <br /> lu.The master plan utilized work done under an earlier feasibility study as a foundation in which to prepare detailed concepts of the overall site <br /> (landscape,circulation,pick-up/drop-off,etc.), renovated Concert Hall and Arena,and new Exhibition Hall, Performance Hall, Sports Pavilion,and <br /> Parking Garage. Fifteen technical studies were also performed during this phase of the project to further investigate site and building conditions, <br /> sustainable design strategies,traffic impacts, retail demand,and cost estimation. Public participation included website updates and stakeholder <br /> and public workshops.AECOM is currently performing design work for the schematic design of the center.As Planner and Graphic Technician, <br /> assembled the master plan document layout and provided figures for the report which summarized planning efforts and technical studies to date,as <br /> well as presented a conceptual plan for the renewed arena,civic center,and cultural and entertainment complex at the current Neal S. Blaisdell <br /> site. <br /> b. (1)TITLE AND LOCATION(City and State) See Project#7 in Section F (2)YEAR COMPLETED <br /> CCH, DDC,Waikiki War Memorial Natatorium EIS PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2020 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Planner and Graphic Technician on the$750k project for prime consultant WCP Inc.The project involved a technical feasibility report and envi- <br /> ronmental impact statement(EIS)that analyzes the impacts from the proposed rehabilitation of the historic World War I Memorial and impacts on the <br /> surrounding area.As Planner and Graphic Technician,provided figures and a 3D model to illustrate the various alternatives to be considered in <br /> the upcoming EIS. <br /> c. (1)TITLE AND LOCATION(City and State) See Project#8 in Section F (2)YEAR COMPLETED <br /> CCH, DPP,Airport Area Transit-Oriented Development Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2019 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Planner and Graphic Technician on the$350k project that involves the preparation of a plan to address potential development opportunities <br /> within a half-mile radius around the Honolulu Rail Transit Project's Pearl Harbor station,Airport station,and Lagoon Station.The project involved <br /> stakeholder and community outreach, including meetings and presentations with business and area organizations.Area concepts were developed and <br /> a preferred alternative was selected for each of the station areas.A final plan has been submitted to the City and AECOM is awaiting comments.As Planner <br /> and Graphic Technician,utilized ArcGIS,Adobe Illustrator,and Sketchup to provide illustrative plans,existing conditions graphics,and massing models <br /> for three station area TOD plans(Airport,Pearl Harbor,and Lagoon Drive). <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> COH, Kealakehe Regional Park Master Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Kona, HI) 2013 <br /> DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Junior Planner who provided planning documents,a 3D model,and animation of the proposed park master plan,as well as designed and maintained <br /> the community outreach website for the$277,637 park planning effort. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE E-14 <br />