Laserfiche WebLink
County of Hawaii, Planning Dept. <br />PL.4) Community Planning (Community/Regional Plans, General Plan, Climate Adaptation) <br />Section E <br />Fiscal Year 2023-2024 <br />County of Hawaii, Planning Dept. <br />Architect -Engineer Qualifications <br />E. RESUMES OF KEY PERSONNEL PROPOSED FORTH IS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Dean Nakano Project Oversight a. TOTAL b. WITH CURRENT FIRM <br />40 11 <br />15. FIRM NAME AND LOCATION (Cityand State) <br />Brown and Caldwell, Honolulu, Hawaii <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BA, Geology, 1977 N/A <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Water Works Association (AWWA); Water Environment Federation/Hawaii Water Environment Association (WEF/ <br />HWEA); National Incident Management System (NIMS) training <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />Impacts of Climate Change on Honolulu Water Supplies and Planning <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Strategies for Mitigation, Honolulu, Hawaii <br />2019 <br />1 N/A <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Principal Investigator. The Water Research Foundation and Honolulu Board of Water Supply selected BC to develop <br />a climate change adaptive management plan to mitigate potential risks to the Honolulu Board of Water Supply's <br />water supply and treatment and distribution system infrastructure. The primary objective was to evaluate climate <br />change impacts on the Honolulu Board of Water Supply and its assets. The project incorporated scenario planning <br />and uncertainty into the process to assess the reliability and resiliency of critical infrastructure. A suite of adaptive <br />measures was identified for the planning horizon for the study: 2020-2100. The project included collaboration with <br />other local government agencies given the level of investment and the widespread impact to infrastructure from sea <br />level rise. <br />Total Contract Amount: $275K Client: Honolulu Board of Water Supply/Water Research Foundation <br />b. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />Countywide Pump Station Inundation Study, Wailuku, Hawaii <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />2021 <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Technical Advisor (Water Resources). BC provided a comprehensive inundation study of the County of Maui's <br />wastewater infrastructure exposed to and impacted by sea level rise and storm surge. The countywide wastewater <br />infrastructure includes 5 wastewater reclamation facilities, 42 wastewater pump stations, and approximately 256 <br />miles of pipelines on the islands of Maui, Molokai, and Lanai. The project assisted the County in defining level <br />of service goals to evaluate and prepare for projected sea level rise, coastal erosion, and storm surge impacts; <br />developed a prioritized list of critical County wastewater facilities and pipeline systems; and identified adaptation <br />strategies and recommended improvements for wastewater system assets. <br />Total Contract Amount: $694K Client: County of Maui, Dept. of Environmental Management, Wastewater <br />Reclamation Division <br />BrownANoCaldwell STANDARD FORM 330 (REV. 6/2006) : 5 <br />