My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005628 06.30.23 BROWN AND CALDWELL CAT PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
PL-INT-2023-005628 06.30.23 BROWN AND CALDWELL CAT PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2023 3:24:44 PM
Creation date
7/5/2023 12:31:52 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005628
Description
BROWN AND CALDWELL, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii, Planning Dept. Section E <br />PL.4) Community Planning (Community/Regional Plans, General Plan, Climate Adaptation) Fiscal Year 2023-2024 <br />d. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />DPW Baseyard Facilities Master Plan <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />Maui, Hawaii <br />Ongoing <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Deputy Project Manager. BC was contracted by the County of Maui to complete a Master Plan for Department <br />of Public Works (DPW) Highways Division Baseyard Facilities. The Master Plan identifies long-term solutions that <br />enable DPW Highways Division to maintain safe roads, bridges, and drainage facilities. This project includes five <br />key tasks: 1) Baseyard Facilities Needs Assessment, 2) Facilities Location Alternatives, 3) Preferred Alternative and <br />Implementation, 4) Baseyards Master Plan and 5) Moloka`i Cemetery Plan. Stakeholder input throughout the process <br />is guided by a stakeholder engagement plan that outlines goals, strategies, and key messaging. The scope of services <br />for this project includes strategic assessment and planningto support infrastructure and operational improvements <br />for DPW Highways Division baseyards. The Baseyards Master Plan identifies and prioritizes actions that support <br />County and State initiatives, and best serve the residents, visitors, and other departments in Maui County. To address <br />sea level rise vulnerability and capacity issues, the Molokai Cemetery Plan task evaluates potential expansion <br />alternatives and gathers stakeholder input to determine a preferred site. <br />Total Contract Amount: $610K Client: County of Maui, Dept. of Public Works, Highways Division <br />e. <br />(1)TITLE AND LOCATION (Cityand State) <br />(2)YEAR COMPLETED <br />Hele Mai Maui Long Range Transportation Plan, Maui Metropolitan <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />Planning Organization, Wailuku, Hawaii <br />2019 <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Project Manager. The Hele Mai Maui Long Range Transportation Plan 2040 identifies projects and programs to meet <br />Maui's transportation needs and opportunities over the next 20 years. Transportation projects must be identified <br />in Hele Mai Maui to be eligible for federal funding. Hele Mai Maui was developed using data and public input and <br />adopted bythe Maui MPO Policy Board in 2019. <br />Total Contract Amount: $400K Client: Maui Metropolitan Planning Organization <br />BrownANoCaldwell STANDARD FORM 330 (REV. 6/2006) : 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.