Laserfiche WebLink
PLANNING DEPARTMENT, COUNTY OF HAWAVI <br />HHF PLANNERS <br />places for people <br />PERSONNELE. RESUMES OF KEY .•. <br />12. NAME <br />13. ROLE IN THIS CONTRACT <br />14. YEARS EXPERIENCE <br />Gail Renard <br />LEED AP <br />Project Manager <br />a. TOTAL <br />b. WITH CURRENT FIRM <br />33 <br />33 <br />15. FIRM NAMEAND LOCATION (CityandState) <br />Helber Hastert & Fee, Planners, Inc. DBA HHF Planners, Honolulu, Hawaii <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(StateandDiscipline) <br />BA/International Relations <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Planning Association, Hawaii Chapter <br />a. <br />b. <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Pu`uhonua o Honaunau National Historical Park Remove & Replace <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />ongoing <br />n/a <br />Park Maintenance Facilities EA <br />Pearl City, Oahu <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X <br />Check if project performed with current firm <br />Project Manager and principal author of NEPA EA for a project to relocate existing maintenance and resource management <br />functions from their current location in substandard facilities in an area known to contain archeological resources to new facilities <br />at a more suitable location. HHF evaluated impacts on key environmental issue areas in three NPS-owned project sites (two within <br />the main Park boundaries and one site three miles mauka); prepared materials in support of the project's ESA Section 7 <br />consultation; prepared NEPA scoping meeting graphic materials; and oversaw biological surveys of all three sites. Project Cost: <br />$138K <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Kawaihae Harbor Repair of Ramp and Dolphins EA <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />2022 <br />n/a <br />Kawaihae, Hawaii Island <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X <br />Check if project performed with current firm <br />Project manager and author of a NEPA EA for repair of berthing and mooring infrastructure at U.S. Army landing facilities at <br />Kawaihae Harbor that support training at the Pohakuloa Training Area. Key environmental issues included NHPA Section 106, ESA <br />Section 7, and EFH consultations. Managed the architectural historian's significance evaluation to support the NHPA Section 106 <br />consultation, prepared CZMA consistency determination, and obtained and addressed public comments. Through her experience <br />working closely with USAG-HI stakeholders in her preparation of the PTA RPMP NEPA EA (Section F Project #6), Ms. Renard gained <br />first-hand knowledge of the organization and culture of this now-NAVFAC PAC customer. Project Cost: $97K <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (712021) <br />