My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005633 06.30.23 HHF PLANNERS CAT PL.4, PL.5, PL.6
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
PL-INT-2023-005633 06.30.23 HHF PLANNERS CAT PL.4, PL.5, PL.6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2023 3:14:32 PM
Creation date
7/5/2023 1:03:38 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005633
Description
HHF PLANNERS, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5, PL.6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING DEPARTMENT, COUNTY OF HAWAVI <br />HHF PLANNERS <br />places for people <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Kunia Village Community Forest Project <br />American Samoa <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />2019 <br />n/a <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X <br />Check if project performed with current firm <br />C. <br />Project manager/ landscape designer for the development of a master plan for the whole village and a neighborhood planting plan <br />for the agricultural worker's housing area and implementation of the first phase of planting in late November2019. The plans are in <br />alignment with urban and community forestry objectives in DLNR's Hawaii Forest Action Plan 2016 (mitigate climate change, <br />increase health and well-being, improve water quality and green infrastructure, etc.) and incorporate principles of permaculture. <br />HHF Fee: $15K <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Hilo Bayfront Trails Master Plan <br />Hilo, Hawaii Island <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />2009 <br />under construction <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X <br />Check if project performed with current firm <br />d. <br />Landscape designer/primary author of a master plan for a three-mile trail system to connect 700 acres from Hilo Harborto historic <br />downtown Hilo. The trail includes a combination of shared use paths, existing and proposed bikeways, bicycle lanes, and existing <br />and proposed pedestrian walkways. The final trail alignment was informed to a high degree by community input and a diverse <br />advisory committee. Trail construction is currently underway. Project Cost: $163K <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Kawainui-Hamakua Marsh Complex Draft Master Plan <br />Kailua, 0`ahu <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />2014 <br />n/a <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X <br />Check if project performed with current firm <br />e. <br />Landscape designer / community meeting facilitator / primary author of the Department of Land and Natural Resources, Division of <br />Forestry and Wildlife's (DOFAW) draft master plan forthe preservation of the 1,000-acre, Kawainui-Hamakua Marsh complex. The <br />project team worked closely with several Native Hawaiian practitioners and cultural groups who have been active stewards of the <br />land and helped to coordinate community engagement with DOFAW and the Department of State Parks. Project Cost: $539K <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (712021) <br />
The URL can be used to link to this page
Your browser does not support the video tag.