My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005633 06.30.23 HHF PLANNERS CAT PL.4, PL.5, PL.6
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
PL-INT-2023-005633 06.30.23 HHF PLANNERS CAT PL.4, PL.5, PL.6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2023 3:14:32 PM
Creation date
7/5/2023 1:03:38 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005633
Description
HHF PLANNERS, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5, PL.6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 HU PLANNERS <br />PLANNING DEPARTMENT, COUNTY OF HAWAI`I places for people <br />E. RESUMES OF KEY PERSONNEL.•• <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />Corlyn Orr Project Manager 21 1 18 <br />15. FIRM NAMEAND LOCATION (City and State) <br />Helber Hastert & Fee, Planners, Inc. DBA HHF Planners, Honolulu, Hawaii <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(StateandDiscipline) <br />MA/Urban and Regional Planning <br />BA/Liberal Studies <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Institute of Certified Planners <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) 1 (2) YEAR COMPLETED <br />`Ewa Villages R-1 Replacement Project Environmental Assessment (EA) <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />2020 <br />n/a <br />`Ewa, 0`ahu <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X Check if project performed with current firm <br />Project manager for an EA for the City and County of Honolulu Department of Facility Maintenance to construct an underground <br />a. <br />non -potable waterline and upgrade existing irrigation water service to the `Ewa Villages community. Federal funding from the U.S. <br />Department of Housing and Urban Development (HUD) required environmental review in compliance with the National <br />Environmental Protection Act (NEPA) and HUD regulations, including consultations for Section 106 of the National Historic <br />Preservation Act, Section 7 of the Endangered Species Act, and Coastal Zone Management federal consistency review. The use of <br />county lands and funds required environmental review in compliance with State regulations (Hawai`i Revised Statutes, Chapter <br />343). Project Cost: $282K <br />(1) T IT LE AN D LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Wahiawa Freshwater State Recreation Area Improvements and EA <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />ongoing <br />n/a <br />Wahiawa, 0`ahu <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X Check if project performed with current firm <br />b. <br />Senior planner and community engagement lead for a project to develop a conceptual site plan to prioritize potential park <br />improvements and to identify implementation strategy for future permitting and funding requirements that supports the State's <br />protocols for design and construction. Developed community outreach program which includes project website, survey, and pop- <br />up event to gather park user feedback. Project Cost: $108K <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Maunawili Falls Trail Improvements Project <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />ongoing <br />n/a <br />Kailua, 0`ahu <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X Check if project performed with current firm <br />C. <br />Project Manager of a community process for a conceptual master plan to identify improvements to Maunawili Falls Trail. <br />The intention of the master plan is to improve trail management and identify facility improvements for trail users, including a new <br />trail realignment that prioritizes protection of archaeological and cultural sites, on -site parking and comfort station facilities for <br />trail users away from neighboring homes, and strategies to manage visitor levels. Project Cost: $400K <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (712021) <br />
The URL can be used to link to this page
Your browser does not support the video tag.