Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 3 <br /> agency,or 10 projects,if not specified. Complete one Section F for each project) IN <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> Hawaii DOT Scour Critical Bridge Project—Bathymetry PROFESSIONAL CONSTRUCTION <br /> SERVICES <br /> and Underwater Inspection <br /> BigIsland,Kauai, Oahu,HI 2015 to present n/a <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> State of Hawaii,DOT Kai Hawaii—Mike Hunneman 1 808-533-2210 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,andcost) <br /> The State Department of <br /> Transportation is assessing up to 27 <br /> bridges across the State for possible. �� 4 ` 4 <br /> scour repairs. In support of this <br /> effort, Sea g En ineerin completed <br /> g p <br /> bathymetry surveys and underwater <br /> inspections of 5 bridges, including ' <br /> Kolekole Bridge and Paheehee <br /> Bridge on Hawaii Island, Wailua <br /> River Bridge and Wailua River <br /> Plantation Bridge on Kauai, and the <br /> Waimea River Bridge on Oahu. The <br /> underwater inspections were <br /> conducted by a three-man dive team using surface supplied air. Sea Engineering was also responsible for <br /> obtaining all required permits for the proposed repair activities. <br /> f- <br /> Cost: 319,655 <br /> (1)FIRM NAME (2)FIRM LOCATION(Cityand (3)ROLE <br /> State <br /> Sea Engineering,Inc. Waimanalo,Oahu, Coastal/Ocean Engineering <br /> Hawaii <br />