My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005433 06.21.23 SEA ENGINEERING INC SOQ CAT PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005433 06.21.23 SEA ENGINEERING INC SOQ CAT PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 6:20:45 PM
Creation date
8/29/2023 7:35:42 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/21/2023
Related Permits
PL-INT-2023-005433
Permit Number
PL-INT-2023-005433
Description
PL-INT-2023-005433 06.21.23 SEA ENGINEERING INC SOQ CAT 4, 5 - PROFESSIONAL SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 4 <br /> agency,or 10 projects,if not specified_ Complete one Section F for each project) <br /> 21. TITLE and LOCATION(City and State) 22. YEAR COMPLETED <br /> Pohoiki Boat Ramp Repair Relocation Study PROFESSIONAL SERVICES CONSTRUCTION <br /> Puna District,Island of Hawaii 2019 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> State of Hawaii,DLNR Edward Underwood(DOBOR) 1 808-587-1966 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Hawaii Island's Kilauea Volcano <br /> lower East Rift Zone began erupting on <br /> May 3, 2018, ultimately transforming <br /> the landscape of the Lower Puna _ <br /> district on the southeast coast of the <br /> island. When the eruption stopped in POHOIKI <br /> August 2018 lava had covered more BOAT RAMP <br /> than 13 square miles of residential, <br /> farm, industrial and natural lands, and x+. <br /> created some 875 acres of new land <br /> extending into the ocean. At Pohoiki � ' <br /> Bay, site of the State DLNR-Division <br /> of Boating and Ocean Recreation <br /> (DOBOR) Pohoiki Boat Ramp facility, large volumes of volcanic debris (rocks, cobbles and <br /> sand) began to fill in the bay and the vicinity of the boat ramp. By the spring of 2019 the bay <br /> was filled, and the boat ramp was land locked by a 200-foot-wide black sand and cobble beach. <br /> Sea Engineering was contracted by the <br /> Department of Land and Natural Resources, <br /> Division of Boating and Ocean Recreation, to <br /> _ - prepare a concept screening study for re-opening <br /> the existing ramp facility or relocating it to an <br /> alternate site. The work involved coastal <br /> engineering to develop concepts for evaluation, <br /> and development of a rough-order-of-magnitude <br /> (ROM) construction cost estimate for the two <br /> concepts. Planning, design and permitting costs <br /> were also estimated. <br /> Cost: $43,960 <br /> (1)FIRM NAME (2)FIRM LOCATION (3)ROLE <br /> (City and State <br /> L,�CE Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.