My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005433 06.21.23 SEA ENGINEERING INC SOQ CAT PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005433 06.21.23 SEA ENGINEERING INC SOQ CAT PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 6:20:45 PM
Creation date
8/29/2023 7:35:42 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/21/2023
Related Permits
PL-INT-2023-005433
Permit Number
PL-INT-2023-005433
Description
PL-INT-2023-005433 06.21.23 SEA ENGINEERING INC SOQ CAT 4, 5 - PROFESSIONAL SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 6 <br /> agency,or 10 projects,if not specified Complete one Section F for each project) <br /> 21. TITLE and LOCATION Cit and State 22. YEAR COMPLETED <br /> Mauna Kea Shoreline Restoration Project PROFESSIONAL SERVICES CONSTRUCTION <br /> Kohala Coast,Hawaii 2018 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> Hookuleana LLC— <br /> Prince Resorts Hawaii Peter Young 808-226-3567 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> The Mauna Kea Resort on Hawaii Island is <br /> planning improvements to their shoreline and <br /> hotel. Sea Engineering has been contracted to <br /> conduct detailed oceanographic and shoreline <br /> investigations to support implementation of <br /> these improvements. Work tasks included: <br /> eo <br /> 1. Wave analyses including deepwater wave <br /> .5 climate, extreme deepwater wave height, <br /> numerical wave modeling of wave <br /> ` transformation to shallow water,wave runup, <br /> analysis of a particular extreme wave event <br /> that resulted in backshore flooding, and sea <br /> level rise impacts. <br /> a, 2. Site investigations including beach profile <br /> measurements, beach topographic survey, <br /> -5 ° ,5 .10 sand sampling and analysis, and assessment <br /> of coastal processes. <br /> � 3. Development of a dune restoration plan <br /> x' based on regional,typical dune morphologies. <br /> / Sea level impacts were considered, and a <br /> design report prepared. <br /> ry Graphic Scale <br /> — � rs o 11 iso• <br /> Cost: $81,855 <br /> (1)FIRM NAME (2)FIRM LOCATION (3)ROLE <br /> (City and State <br /> �Xl Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.