Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 7 <br /> agency,or 10 projects,if not specified- Complete one Section F for each project) <br /> 21. TITLE and LOCATION(Cityand State) 22. YEAR COMPLETED <br /> Project Conditions Survey Inspections of Federal Coastal PROFESSIONAL SERVICES CONSTRUCTION <br /> Navigation Structures 2015,2016,& n/a <br /> Hilo,Kawaihae,Lau ahoehoe,Pohoiki 2017 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> USACE Mike Hunneman—KAI Hawaii 1 808-533-2210 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Sea Engineering was contracted to perform <br /> inspections of 24 federal coastal navigation <br /> structures (CNS)throughout Hawaii, Guam, Rota, - <br /> and American Samoa operated and maintained by , <br /> the U.S. Army Corps of Engineers (USACE), - <br /> Pacific Ocean Division (POD), Honolulu District <br /> (POH). The purposes of the inspections were to <br /> verify the current condition of the structures,locate s - <br /> areas of concern on each structure,and identify and <br /> recommend future maintenance requirements. <br /> Specific work tasks included: <br /> Kawaihae Small Boat Harbor <br /> 1) Categorizing each CNS into distinct reaches according to type of construction (rubble- <br /> mound, concrete armor, sheet pile, etc.); unique structural feature (head, trunk, root, etc.); and <br /> cross-sectional features (crest elevation, side slopes,toe protection, etc.). <br /> 2) Conducting inspections by physically walking the length of each CNS and inspecting areas <br /> including the crest, slopes, and toe of the structure. Damage was located with accurate GPS, <br /> described and photographed. <br /> 3) Preparing draft and final post-inspection <br /> reports that summarize the findings documented <br /> during the site inspection. <br /> 4) Preparing a plan-view map including the <br /> aerial imagery of the project site, stationing, <br /> structure components, CEPD benchmark, and <br /> the GPS location of each finding recorded during <br /> the site inspection. <br /> Cost: $131,994 <br /> (1)FIRM NAME (2)FIRM LOCATION (3)ROLE <br /> (City and State <br /> �xl Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering <br />