Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 l l <br /> projects,if not specified. Complete one Section F for each project) <br /> 21. TITLE and LOCATION(CityandState) 22. YEAR COMPLETED <br /> PROFESSIONAL CONSTRUCTION <br /> Post-Storm Hydrographic Survey of Hilo Harbor,Island of Hawaii SERVICES <br /> Hilo,Hawaii 2015 n/a <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> USACE-POH/AECOM Jerry Matsuda(AECOM) 808-356-5370 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Scone: Tropical Storm Iselle hit the east side of <br /> Hawaii Island at approximately 11:00 pm on August <br /> 7, 2014,with near hurricane force winds of 70 mph. <br /> Concerns that the Hilo Harbor channel would be <br /> compromised by sunken debris or other obstructions Pe 'Tne.... a�A�PM Mon <br /> due to the effects of the storm prompted harbor <br /> closure until a hydrographic survey could be <br /> completed to verify that the channel was clear of 8 PM Sun <br /> 9 PM Sat <br /> obstacles. Sea Engineering, Inc. (SEI) was notified ' „PM Thu <br /> at approximately noon on August 7, 2014, that a w <br /> survey would be necessary the following day at Hilo ~ <br /> T—pi—i Storm Is He 'Current Information: •Os Position.-Forecast Pons:a <br /> Harbor. Two survey engineers from Sea >> �o= <br /> ' a=�o",a.0N,s.,W .rropi..l Cyd� Q Pwt T-pi-I <br /> Min S.—i-d!wine mph sustai—Win- D< mph <br /> Engineering with equipment flew to Hilo mid- Potential Tack Area`a` Watches:n"� War ngs"'410 mph M>„pmph <br /> morning on August 8 to conduct the survey. The �Day1-3 CJ, "ay45 11-im ae Trop.storm �H-rim.-e To°storm <br /> survey was successfully completed, and results were communicated to the USACOE-POH at 7:00 pm on <br /> August 8,2014. The Harbor was immediately re-opened. <br /> 12 21 37 13 Co 11 <br /> 40 M l 38 19 114 13 13 <br /> 40 37 .13 35 _ ,14 9 <br /> 2 sou�oeas oar•ano11 <br /> 39 38 39 //n 34 35 13 r acer i '19 14 ,.La7FOfiM 8 <br /> � f 111 9-- <br /> _--------- <br /> ,. <br /> pit <br /> i 1 <br /> n p <br /> ` 1��_�28 3 <br /> r14 <br /> 13 <br /> 10,C.oconut I * IO 98o** 8 S Sh Co 8 gg9 <br /> 0 ANCHORAGE ARtA <br /> TV ` <br /> i 9.••'fa°1 iR * 8 t;0.728h(see dote A} & 5• >< � <br /> 7 10 .4iRk <br /> Scan sonar mosaic of Federal Project Area,Hilo Harbor <br /> Cost: $15,000 <br /> 1 FIRM NAME 2 FIRM LOCATION Cit and State 3 ROLE <br /> Sea Engineering,Inc. Waimanalo, Oahu, Hawaii Coastal/Ocean Engineering <br />