|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT -C
<br />(Complete one Section E for each key person.) cwwanit
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Jordan Moniuszko, PE CCM Environmental/Civil Engineer, a. TOTAL b. WITH CURRENT FIRM
<br />Construction Manager 14 9
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Oceanit Laboratories, Inc, Honolulu, Hawai'i
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />B.S. / 2009 / Mechanical Engineering Hawaii / Civil Engineering / 2018
<br />B.S. / 2009 / Environmental Science
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />2009 / SCUBA Open Water; 2009 / Environmental Compliance Training and Tracking System; 2010 / OSHA 30 Hour Construction
<br />Safety & Health; 2010 / National Pollutant Discharge Elimination System Awareness; 2013 / CPR & First Aid; 2013 / OSHA 24 Hour
<br />Confined Space Competent Person; 2014 / Hawaii DOBOR Safe Boating; 2021 / OSHA 2 Hour Asbestos Awareness
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />2024 (Est.)
<br />Waikiki Aquarium Effluent Disposal System Upgrade
<br />Honolulu, Hawai'i
<br />a.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Manager for this project to evaluate, permit, and design upgrades to the aquatic life exhibit effluent disposal system in
<br />order to meet updated NPDES regulatory requirements. The team consisted of civil, electrical, and mechanical engineers,
<br />biologist, hydrogeologist, and aquatic life support system specialist.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />2022 (Est.)
<br />Anahola Farm Lots Subdivision Water System Improvements
<br />Anahola, Hawai'i
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer for this project to replace a rural subdivision 0.5 MG water tank, water transmission lines and appurtenances,
<br />and install a system interconnection with County water system. The team consisted of civil, structural, mechanical, and
<br />electrical engineers.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />IAB Basement Water Infiltration Repairs at Daniel K Inouye Intl Airport
<br />Honolulu, Hawai'i
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />2023 (Est.)
<br />C.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer for this project to investigate sources of and design repairs for flooding to the basement of the overseas
<br />terminal at Honolulu International Airport. A variety of techniques were used to scan concrete and gather data to confirm
<br />sources of water infiltration. Final design includes repairs to floor slab, exterior and interior drainage improvements, and new
<br />floor slab installation.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2021
<br />CONSTRUCTION (If applicable)
<br />2022
<br />Salt Lake Watershed Structural BMP Implementation
<br />Salt Lake, Hawai'i
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer for this project to install remote sensors and stormwater samplers, collect water quality and meteorologic data,
<br />develop and calibrate a watershed model, model various BMP scenarios, design various structural stormwater Best
<br />Management Practice measures, and provide construction management services at Salt Lake Watershed in urban Honolulu.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Ka'elepulu Pond & Wetland Environmental Maintenance Dredging
<br />Kailua, Hawai'i
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />2022 (Est.)
<br />e.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Design Engineer and Construction Manager for an ecosystem restoration project to reconnect two estuarine bodies of water
<br />located in Windward Oahu. Federal, State and local permits and implementation of associated regulatory conditions were
<br />required prior to construction.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />Kahalu'u Flood Control Lagoon Maintenance Dredging Kaneohe, Hawai'i
<br />for Department of Design and Construction
<br />f.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer for this windward Oahu maintenance dredging and upland disposal project currently in progress for the City
<br />and County of Honolulu. Wrote and executed Sediment Sampling and Analysis Plan. Performed upland disposal scenario and
<br />cost estimate analysis. To perform design and services during bidding.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Kawainui Stream Flow Restoration Kailua, Hawai'i for
<br />Department of Land and Natural Resources
<br />2015
<br />2015
<br />g'
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer for this environmental remediation project. Designed and installed a temporary levee overflow siphon to return
<br />flow to the Kawainui Stream and Hamakua Marsh from the Kawainui Marsh in an experimental study. Gathered water quality
<br />data from before and after the temporary siphon installation. Preliminary design of a permanent siphon constructed through the
<br />levee.
<br />STANDARD FORM 330 (REV. 7/2021)
<br />
|