Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT -C <br />(Complete one Section E for each key person.) CwManjt <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Bryan Fong Project Engineer, Construction a. TOTAL b. WITH CURRENT FIRM <br />Inspector 5 1 1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Oceanit Laboratories, Inc, Honolulu, Hawai'i <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />University of Hawaii BS Civil Engineering / 2016 Hawaii, Civil Engineering, No. <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />State of Hawaii, Department of Transportation, Highways Division Oahu <br />District Engineer 1-11 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Review and approve permit requests for oversized and overweight vehicle movement, Use and Occupancy of State Highways, <br />a. <br />permits to perform work on State Highways. Input lane closures into ArcGIS to inform public of lane closures. Solicits bid <br />offers for State Maintenance contracts through HlePro system by drafting SOW, estimated bid amounts, relevant standard <br />specifications and drawings, wage -rate and scale and general terms and conditions. QA/QC liaison for bridge inspection <br />program in coordination with the Federal Highway's Administration for the purposes of performing inspections as well as <br />monitoring contractors ensuring compliance with best practices. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Construction Management Services for Phase 1 of the OST ACM & Air <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Conditioning Modifications at the Daniel K. Inouye International Airport <br />Ongoing <br />Honolulu, HI <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Overall construction management services and on -site DOTA representative for construction and <br />postconstruction phases. Work with construction contractor, subconsultants and SMEs. Perform daily inspection, work <br />observation, and reporting. Conduct meetings with owner. Confirm safety and quality assurances. Manage project budget. <br />Manage submittal responses, RFIs, field orders, change orders, work outages, issues, and disputes. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Nimitz Highway Void Investigation Phase 2 <br />Honolulu, HI <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />C. <br />Project Engineer. Review of existing field inspection data, as-builts, and surveys locating the alignment of storm drain lines in <br />which fine material is possibly seeping through causing undermining of the road. Coordinate with subconsultants coordinating <br />the procurement of temporary street usage permits for temporary traffic control devices, and necessary BMP measures that <br />need to be implemented during preconstruction, construction, and post -construction phases. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Waikiki Aquarium Effluent Disposal System Upgrade Installation of <br />Flowmeters <br />2022 <br />2022 <br />Honolulu, Hawai'i <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Erosion and Sediment Control Plan coordinator and field inspector. Conducted weekly BMP inspections during construction of <br />design -build project ensuring that the contractor follows the designer's erosion and sediment control plan. Documenting and <br />recording inspection data and working with the contractor to address deficiencies. Develop Environmental Assessment on utility <br />conflicts with new effluent disposal system upgrades. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Emergency repairs at Kaipapau Stream Bridge <br />Hauula, HI <br />2021 <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Project Manager. Scope out emergency repairs in conjunction with design engineer. Contract and procurement of funding <br />sources. Plan and coordinate work schedule with contractor including BMPs and environmental compliance protection <br />measures. Document and record daily construction progress and reporting. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Repave Kamehameha Highway from Waihona Street to Kuala Street <br />Pearl City, Hawai'i <br />2022 <br />2022 <br />f <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Project Manager. Scope paving limits and depth. Procure construction services and funding and award to lowest bidding <br />contractor. Plan schedule, traffic control, lane closures, BMPs, and Environmental compliance with contractor during repaving <br />efforts. Daily field inspection and report documentation. <br />STANDARD FORM 330 ( REV. 7/2021) <br />