E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT -C
<br />(Complete one Section E for each key person.) CwManjt
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Bryan Fong Project Engineer, Construction a. TOTAL b. WITH CURRENT FIRM
<br />Inspector 5 1 1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Oceanit Laboratories, Inc, Honolulu, Hawai'i
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />University of Hawaii BS Civil Engineering / 2016 Hawaii, Civil Engineering, No.
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />State of Hawaii, Department of Transportation, Highways Division Oahu
<br />District Engineer 1-11
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Review and approve permit requests for oversized and overweight vehicle movement, Use and Occupancy of State Highways,
<br />a.
<br />permits to perform work on State Highways. Input lane closures into ArcGIS to inform public of lane closures. Solicits bid
<br />offers for State Maintenance contracts through HlePro system by drafting SOW, estimated bid amounts, relevant standard
<br />specifications and drawings, wage -rate and scale and general terms and conditions. QA/QC liaison for bridge inspection
<br />program in coordination with the Federal Highway's Administration for the purposes of performing inspections as well as
<br />monitoring contractors ensuring compliance with best practices.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Construction Management Services for Phase 1 of the OST ACM & Air
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Conditioning Modifications at the Daniel K. Inouye International Airport
<br />Ongoing
<br />Honolulu, HI
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Overall construction management services and on -site DOTA representative for construction and
<br />postconstruction phases. Work with construction contractor, subconsultants and SMEs. Perform daily inspection, work
<br />observation, and reporting. Conduct meetings with owner. Confirm safety and quality assurances. Manage project budget.
<br />Manage submittal responses, RFIs, field orders, change orders, work outages, issues, and disputes.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Nimitz Highway Void Investigation Phase 2
<br />Honolulu, HI
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />C.
<br />Project Engineer. Review of existing field inspection data, as-builts, and surveys locating the alignment of storm drain lines in
<br />which fine material is possibly seeping through causing undermining of the road. Coordinate with subconsultants coordinating
<br />the procurement of temporary street usage permits for temporary traffic control devices, and necessary BMP measures that
<br />need to be implemented during preconstruction, construction, and post -construction phases.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Waikiki Aquarium Effluent Disposal System Upgrade Installation of
<br />Flowmeters
<br />2022
<br />2022
<br />Honolulu, Hawai'i
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Erosion and Sediment Control Plan coordinator and field inspector. Conducted weekly BMP inspections during construction of
<br />design -build project ensuring that the contractor follows the designer's erosion and sediment control plan. Documenting and
<br />recording inspection data and working with the contractor to address deficiencies. Develop Environmental Assessment on utility
<br />conflicts with new effluent disposal system upgrades.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Emergency repairs at Kaipapau Stream Bridge
<br />Hauula, HI
<br />2021
<br />e.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Project Manager. Scope out emergency repairs in conjunction with design engineer. Contract and procurement of funding
<br />sources. Plan and coordinate work schedule with contractor including BMPs and environmental compliance protection
<br />measures. Document and record daily construction progress and reporting.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Repave Kamehameha Highway from Waihona Street to Kuala Street
<br />Pearl City, Hawai'i
<br />2022
<br />2022
<br />f
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Project Manager. Scope paving limits and depth. Procure construction services and funding and award to lowest bidding
<br />contractor. Plan schedule, traffic control, lane closures, BMPs, and Environmental compliance with contractor during repaving
<br />efforts. Daily field inspection and report documentation.
<br />STANDARD FORM 330 ( REV. 7/2021)