Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 6 <br />Complete one Section F for each proiect.) <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Groin and Beach Nourishment at Kauai Kailani Condominiums PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Kapa`a, Hawaii Ongoing Anticipated summer <br />2022 <br />23. PROJECT OWNER'S INFORMATION <br />a. F'KUJtl:1 UVVIVtK 1). F'UI IV I Ur UUN IAL; I IVHIVIt C. F'UIIV 1 Ur L;UN 1AL; 1 I tLtF NUIVt IVUIV1btK <br />Association of Unit Owner of Kauai Kailani Brian Mose (250) 248-0969 <br />Condominiums <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Kauai Kailani has had several beach erosion since 2012, when a concrete <br />groin upstream of the property was removed. Over a two-year period following <br />the groin removal, erosion removed approximately 500 cy of sand. An <br />emergency temporary sand bag revetment was installed in 2017 to protect the <br />escarpment fronting the property. The temporary erosion control provided <br />protection while Oceanit worked on planning a long-term solution. <br />The scope was to restore Kauai Kailani Beach by constructing a temporary <br />sand bag groin and to use compatible beach sand that has accreted in the <br />Waipouli Drainage Canal for beach nourishment fronting the condominiums. <br />The proposed temporary sand bag groin was designed to occupy a similar <br />footprint to the concrete structure that was removed in 2012. <br />The beach nourishment required approximately 1,000 cy of beach sand. Post Construction <br />Subsequent beach nourishments are anticipated after 3-4 years, with each <br />100-200 cy volumes, over the course of 10 years. <br />Erosion before project <br />Engineering design services included: <br />1) Site inspection, evaluation and recommendations-, <br />2) Construction plans including grading, site, BMP notes and detail plans <br />3) Prepare specifications and contract documents <br />4) Prepare required permits <br />5) Construction support services when required. <br />Approximate construction cost: $1,000,000 <br />During Construction <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />Oceanit Laboratories, Inc. I Honolulu, HI I Prime <br />STANDARD FORM 330 (REV. 7/2021) <br />