Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Environmental Scientist/Field Operations a. TOTAL b. WTH CURRENT FIRM <br /> Adam Custer ?' Manager 12 1 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Renaissance Consulting, LLC <br /> Keaau, Hawaii <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S. Univ. of West Florida, Environmental Science, 2006 State of Hawaii Asbestos Professional <br /> A.A. Pensacola Junior College, 2003 State of Hawaii Lead Professional <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Hazardous Waste Operation and Emergency Response Certified <br /> OSHA 30-Hour Construction Certified <br /> Military Munitions Support Services— Munitions Medley Seminar <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION(City and State) 2 YEAR COMPLETED <br /> Lead Paint Removal Monitoring, Diego Garcia, British Indian Ocean PROFESSIONAL SERVICES CONSTRUCTION(If applicable)2021-2022 <br /> Territory <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 1:1Check if project performed with current firm <br /> a. Role: Site Safety and Health Officer (SSHO)/Project Monitor Scope: MNA was retained to conduct air monitoring <br /> during lead paint removal in and on four aboveground storage tanks (AST) used to store fuel on the island of Diego <br /> Garcia. Mr. Custer was retained by MNA as an independent consultant to act as SSHO and conducted the monitoring <br /> during the lead paint removal work on the AST between June 2021 to June 2022. In addition, Mr. Custer attended <br /> daily safety and planning meetings and provided emergency response, guidance, and soil sampling following wind <br /> damage to the tank/lead paint containment system. Cost: $385,000 <br /> (1) TITLE AND LOCATION(City and State) 2 YEAR COMPLETED <br /> Misc. R&M FY06-10, Air Monitoring and Reporting for Lead Paint PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2019 <br /> Removal at Building A Covered Walkway, Hilo High School, Island of <br /> Hawaii <br /> b. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Role: Industrial Hygienist Scope: RENCON was contracted to conduct air monitoring during lead paint removal from <br /> Building A Covered Walkway of Hilo High School. The work was completed over four days with samples submitted <br /> daily to a laboratory on Oahu. RENCON submitted a letter report summarizing the work methods and laboratory <br /> results. Mr. Custer conducted the field work, including preparation, sample collection, and oversight. Cost: $6,500 <br /> (1) TITLE AND LOCATION(City and State) 2 YEAR COMPLETED <br /> PROFESSIONAL CONSTRUCTION(If applicable) <br /> Various Misc. R&M Department of Education, Island of Hawaii SERVICES <br /> Ongoing <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> C. Role: Field Operations Manager Scope: RENCON was retained by Fleming &Associates to conduct multiple <br /> targeted hazardous materials surveys and provide reports indicating findings. All projects included design support <br /> where hazardous materials were identified. Design support services included specifications, cost estimates, and <br /> response to RFI. In addition, RENCON provided soil investigation and reporting services for several school sites on <br /> the Island of Hawaii and provided various construction phase support services, including but not limited to HDOH <br /> coordination and draft of Environmental Hazard Management Plans (EHMP) documentation, as required by the <br /> State. Cost: $35,000 <br /> (1) TITLE AND LOCATION(City and State) 2 YEAR COMPLETED <br /> Phase I Environmental Site Assessment for Arion Energy Solar Farm, SERVICES PROFESSIONAL CONSTRUCTION(If applicable) <br /> TMK (3) 9-3-004:027 and :028, South Point, Island of Hawaii 2023 <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> d Role: Environmental Scientist Scope: RENCON was retained to complete a Phase I Environmental Site Assessment <br /> (ESA)for two TMK, totaling 69.47 acres. The focus of the Phase I ESA is to identify, to the extent feasible pursuant <br /> to the ASTM International E 1527 Method, recognized environmental conditions in connection with the subject <br /> property. Specifically, RENCON reviewed available environmental reports for the subject property and historical and <br /> geological information for the subject property and surrounding properties, conducted a site reconnaissance of the <br /> property, reviewed records and historical maps for interpretation of past use activities, conducted interviews, and <br /> compiled a report summarizing the results of the assessment activities and findings. Cost: $5,500 <br />