Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY <br /> (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Maluhia and Koloa Road Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Kauai, Hawaii On-going On-going <br /> 23. PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> County of Kauai, Department of Public Mr. Troy Tanigawa (808)241-4154 <br /> Works <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> WSP led a team to complete environmental clearances and design documents to reconstruct and rehabilitate Maluhia Road and Koloa <br /> Road to maintain the riding surfaces for these increasingly utilized roadways. Involvement of federal funds also required the Kaua'i <br /> County Department of Public Works(DPW)to comply with applicable federal and State design standards, including upgrading the <br /> roadways to meet current safety standards where feasible. Based on the available right-of-way and the roadside topography,the project <br /> involved adding 2-foot to 6-foot wide shoulders on each side of the roadway where it could be reasonably accommodated. The addition of <br /> paved shoulders along this corridor was intended to provide a refuge area for disabled vehicles, as well as for bicyclists and pedestrians <br /> (walkers and joggers). Additionally, the shoulders were intended to provide lateral support for the pavement structure, keeping the sub- <br /> base in place to support the riding surface. They also channel storm water runoff farther away from the travel lanes which provides for <br /> safer travel during periods of heavy downpours, but also reduces seepage into the pavement which can prolong the pavement life. In all, <br /> the planned project included the following general tasks: <br /> • Pavement rehabilitation, including <br /> resurfacing and reconstruction, where <br /> needed, on Koloa Road Kaumuali'i A .?'t <br /> Highway to Po'ipu Road)and Maluhia Road : $ <br /> (Kaumuali'i Highway to Koloa Road), 4 <br /> oriP <br /> • Extending the pavement shoulders by up to ;j , �6 • t ,� } <br /> 6 feet in each direction, where it can be . 4p4' <br /> accommodated within the existing roadway -- f 4,04°' <br /> right-of-way, .c �` "� ,, 'r <br /> r #a 3 t.E <br /> • Addition of a left-turn auxiliary lane on 1 , <br /> Koloa Road at Piko Road and Lauoho ► rtkikiiik- + . s <br /> Road, ' L .:r,: • <br /> • Addition of a left-turn pocket on Maluhia <br /> Road from Ala Kinoiki, <br /> • Restriping and pavement widening to ' <br /> create a left-turn auxiliary lane on Koloa " <br /> Road at'Oma'o Road, 1111111101i 4 1 + - . <br /> • Installation of a roundabout at the <br /> intersection of Koloa Road and Ala •* <br /> Kalanikaumaka, and <br /> • Ancillary improvements, including minor <br /> structural improvements at select and <br /> discrete locations, such as endpost <br /> construction, guardrail repair, drainage • <br /> modifications, and other safety <br /> improvements. <br /> Environmental clearances involved with the project included: <br /> • National Environmental Policy Act(NEPA), Categorical Exclusion <br /> • National Historic Preservation Action (NHPA)Section 106, no adverse effect <br /> • Endangered Species Act(ESA)Section 7, no effect <br /> • Coastal Zone Management <br /> Majority of the work was performed in-house, using WSP staff. <br /> Contract Value: $896 thousand <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. <br /> WSP USA Inc. Honolulu, Hawaii Prime <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 14 <br />