|
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Darin N. Chinen, PE Civil Task Leader or Technical a.TOTAL b.WITH CURRENT
<br /> Resource/Quality Assurance (Civil) FIRM
<br /> 34 34
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> WSP USA Inc., Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.B.A. Hawaii, Professional Engineer
<br /> B.S., Civil Engineering
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> American Society of Civil Engineers; Consulting Engineers Council of Hawaii
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Program and Project Management for Rehabilitation of Streets, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Oahu, Hawaii On-going On-going
<br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a. Project manager responsible for the execution of various program and project management services. Project scope includes planning
<br /> and management of the City and County of Honolulu's rehabilitation of streets Capital Improvement Program (CIP). Tasks include
<br /> preparation of annual CIP budgets, programming of new projects, tracking of program funds, project management of individual
<br /> consultant and construction contracts, and preparation of construction documents for in-house design projects.
<br /> Current Contract Fee: $8.0 million.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Traffic Improvements at Various Locations, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2003 2004
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project manager responsible for providing planning and engineering services for traffic improvements to existing intersections and
<br /> highway facilities on Oahu. Project scope included traffic studies, environmental documentation, conceptual engineering designs,
<br /> public presentations, and final PS&E for projects ranging from intersection modifications to traffic calming improvements.
<br /> Contract Fee: $600 thousand.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kapiolani Boulevard Reconstruction, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2011 2015
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> c. Project manager responsible for the design of this roadway reconstruction project. The project includes reconstruction of existing
<br /> asphalt concrete pavement, installation of portland cement concrete (PCC) pavement bus lanes, pavement markings design,
<br /> reconstruction of existing concrete curbs, concrete catch basin repair, and street light and traffic signal systems. Project scope
<br /> includes preparation of final plans,specifications, and cost estimate (PS&E), and coordination of permitting required for project
<br /> construction.
<br /> Contract Fee: $662 thousand.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Reconstruction of Wilhelmina Rise, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2018 2018
<br /> d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project manager responsible for the design of this PCC pavement reconstruction project. The project includes reconstruction of PCC
<br /> pavements, pavement markings design, reconstruction of existing concrete curbs concrete catch basin repair, and tree removals.
<br /> Project scope includes preparation of final PS&E, and coordination of permitting required for project construction.
<br /> Contract Fee: $197 thousand
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waipio Point Access Road Improvements, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2010 2016
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> e.
<br /> Project manager responsible for the design of this roadway improvements project. The project includes reconstruction of existing
<br /> roadway, new pedestrian and bikeway facility, drainage and grading improvements, signing and striping, street lighting systems, utility
<br /> relocations, and permanent best management practices. Project scope includes preparation of final PS&E, drainage report and
<br /> calculations, and coordination of permitting required for project construction.
<br /> Contract Value: $455 thousand
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 4
<br />
|