My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005616 06.29.23 JACOBS CAT PL.4, PL.5, PL.8
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005616 06.29.23 JACOBS CAT PL.4, PL.5, PL.8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 1:44:27 PM
Creation date
8/29/2023 9:30:59 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005616
Description
JACOBS, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5, PL.8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION) <br /> Marine Corps Base Hawaii(MCBH)Home Basing Environmental Assessment(EA), <br /> Naval Facilities Engineering Command,Pacific;Oahu,HI 2022 <br /> Quality Control Manager. Prepared quality management plans and facilitated quality reviews at 60%,90%design stages for <br /> the design of a $650 million upgrade to the Honouliuli WWTP to meet the requirements of a USEPA-mandated consent decree <br /> d. and increase the plant capacity to 40 million gallons per day(mgd). Design elements include:incorporating the thermal <br /> hydrolysis process(THP)prior to digestion to increase volatile solids destruction,digester gas production,and dewatered <br /> solids concentrations;enhancing the existing anaerobic digestion process;a cake receiving and storage facility for trucked-in <br /> dewatered cake from other treatment plants; new dewatering and pre-THP dewatering facilities;low-temperature belt dryer <br /> facility to produce exceptional Class A biosolids product;digester gas treatment and storage facility;and a combined heat and <br /> power(CHP)facility. <br /> Joint Base Pearl Harbor-Hickam,STOP Part 3 Advanced Planning Study,CS17 <br /> Environmental/Safety Requirements,Naval Facilities Engineering Command,Pacific, 2021 <br /> Oahu, HI <br /> e Deputy Study Lead.Matt coordinated data acquisition and analysis with project team Subject Matter Experts and Navy <br /> Remedial Project Managers,performed QA/QC of data analysis and all GIS deliverables.The program is currently conducting <br /> advanced planning necessary to identify specific investments needed at each shipyard.The information gathered for Core <br /> Study(CS) 17 will be used to indicate environmental and explosives safety constraints that may influence overall development <br /> of Pearl Harbor Naval Shipyard.The project team created a Navy-compatible geodatabase with field-verified remediation <br /> status data for smooth integration of CERCLA planning with overall Navy installation planning. <br /> Jacobs STANDARD FORM 330(REV.7/2021)111 <br /> RACKING 4:0063i000009AVJNAA4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.