Laserfiche WebLink
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION) <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section Efor each key person.) <br /> 14.YEARS EXPERIENCE <br /> Tony Ali,PE, PMP Project Manager a.TOTAL b.WITH CURRENT FIRM <br /> 34 32 <br /> 15.FIRM NAME AND LOCATION(City and S: <br /> Jacobs,Honolulu, Hawaii <br /> BS, Environmental Engineering Professional Engineer(Civil): Hawaii#13879, Exp.4/30/2024; <br /> BS,Metallurgical Engineering and Materials Science Nevada#13682,Maine#9144;Ontario#90251597 <br /> BS,Chemistry Project Management Institute PMP#1417130 <br /> American Petrochemical Institute(API); Project Management Institute(PMP) <br /> U.S.Army Corps of Engineers QCM(POH 1100074) <br /> Tony has 34 years of experience in planning,design,project management,construction management,and startup and <br /> commissioning of water,wastewater treatment and conveyance facilities. He is experienced with the City and County of Honolulu <br /> Design Standards for wastewater and the planning and permitting process.Tony is also experienced in design delivery including <br /> design-bid-build,design-build,design-build-operate,privatization and construction contracts. <br /> 19.RELEVANT PROJECTS <br /> Kamehameha Highway Wastewater Pump Station Force Main System Improvements, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> City and County of Honolulu, Honolulu,HI Ongoing 2021 <br /> a. Project Manager.Assumed project manager role during construction closeout of facility improvements that provided for future <br /> hydraulic capacity during wet weather storm events as recommended by the Final Sewer I/I Plan submitted to the US <br /> Environmental Protection Agency(EPA).Services during construction is ongoing and includes construction punch list item <br /> completion,closing out permits and preparation of record drawings.Also,providing engineering support for follow-on design <br /> for wet well improvements and driveway grading. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waianae Wastewater Treatment Plant(WWTP)Improvements and Upgrades, SERVICES CONSTRUCTION(if a. <br /> City and County of Honolulu,Waianae, HI 2016 2021 <br /> b. <br /> Project Manager. Responsible for bid services and engineering services during construction for wastewater treatment including <br /> rehabilitation of the primary clarifiers and primary effluent boxes and piping,replacement of the headworks screens and <br /> associated equipment,and rehabilitation of the grit removal system and preparation tanks and channels. <br /> LE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waianae Wastewater Treatment Plant(WWTP)Improvements and Upgrades, DROFESSIONAL SERVICES CONSTR'J"-'r�,r'aoplicab;e' <br /> City and County of Honolulu,Waianae, HI 2016 2016 <br /> x(MF .,e4o•medC. <br /> . iti <br /> Project Manager.Responsible for bid services and office services during construction for wastewater treatment including <br /> rehabilitation of the primary clarifiers and primary effluent boxes and piping,replacement of the headworks screens and <br /> associated equipment,and rehabilitation of the grit removal system and pre-aeration tanks and channels. <br /> 2)rEArtC . E <br /> PROFFCCIONLI UngoingICES CONSTRUCTION(if applicable) <br /> Nuuanu Environmental Assessment,Honolulu Board of Water Supply,Honolulu,HI <br /> tt performed with current <br /> Project Manager.The original 2-MG reservoir is connected to a watershed located on the former Queen's palace grounds. Due <br /> d. to the site's location near Department of Land and Natural Resources(DLNR)conservation lands,the Jacobs team is <br /> conducting additional due diligence studies(noise,biological,endangered species,flora and fauna,cultural surveys)to define <br /> the site and conduct wetland delineation to avoid impacts to the watershed during construction.This project involves extensive <br /> coordination with the public,which includes interviewing prominent community members and kupuna to protect this vital <br /> watershed. <br /> Jacobs STANDARD FORM 330(REV.7/2021)112 <br /> TRACKING#:0063f000009AVJNAA4 <br />