COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION)
<br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section Efor each key person.)
<br /> 12 NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Jessica Burdick, PE, PMP Project Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 23 23
<br /> 15.FIRM NAME AND LOCATION(City and S:
<br /> Jacobs,Honolulu, Hawaii
<br /> MS,Civil and Environmental Engineering Professional Engineer(Civil): Hawaii,#11915-C, Exp.4/30/2024
<br /> BS,Civil and Environmental Engineering Project Management Professional(PMP):#1418334
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Jessica has provided civil and environmental engineering, project management,and construction services for more than 140 DoD,
<br /> municipal,and commercial projects in Hawaii over the past 17 years. Her project experience includes planning document
<br /> preparation;design and construction of water,wastewater,and electrical utilities;an aviation administration building;an explosives
<br /> ordinance disposal(EOD)compound;a hazardous waste storage area and wash racks;and remedial action planning,design,and
<br /> construction.She has managed contracts for programming,design-build,design,construction,permitting,and regulatory
<br /> compliance projects.
<br /> 19.RELEVANT PROJECTS
<br /> PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Statewide Freight Plan,Hawaii Department of Transportation(HDOT),Statewide,HI 2018
<br /> a.
<br /> Project Engineer. Project that addressed regional transportation issues and developed tools that helped conduct quick
<br /> analysis of National Performance Management Research Data Set data to give a picture of truck bottlenecks(using methods we
<br /> developed with FHWA funding)and traffic reliability.The final plan describes critical freight assets with special focus on freight
<br /> connectors from port,aggregate freight flow information from multiple sources,and identified critical urban and rural
<br /> corridors.
<br /> (1)TITLE AND LOCATION(City and State)
<br /> Honolulu Rail Transit Project,General Engineering Consultant Support(GEC III),
<br /> Honolulu Authority for Rapid Transportation(HART), Honolulu,HI Ongoing Ongoing
<br /> -R,T'ON(B•e'scn^c;ze CP,r'r Anh Snn1'nC Rn'c
<br /> Task Lead.Providing environmental and planning support to comply with the state,city,and Federal Transit Authority(FTA)
<br /> b. for decision documents of the project. Reviewed contractor prepared National Environmental Policy Act(NEPA)and Hawaii
<br /> Revised Statutes(HRS)Chapter 343 environmental documentation and supporting technical reports for any elements of the
<br /> original 20-mile project.Assisting in all areas of environmental compliance with documented mitigation measures,decision
<br /> documents for the project,permits,and all other commitments specified by the Final EIS/Record of Decision and Section 106
<br /> Programmatic Agreement.
<br /> -_ - , - (2)YEAR COMPLETED
<br /> Kalaupapa National Historical Park(NHP)Electrical System Rehabilitation, PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> National Park Service(NPS),Kalawao County,Molokai, HI Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current f rm
<br /> Project Manager.Jacobs provided planning,compliance,environmental,and engineering design services to repair and
<br /> rehabilitate the failing primary and secondary electrical system infrastructure for a 1,250-acre site at Kalaupapa NHP,
<br /> consisting of 30,000 LF overhead cabling and 7,800 LF of new underground cable.Completed the predesign and schematic
<br /> c.
<br /> design for this$576,000 project,involving rehabilitation of the Kalaupapa's overhead distribution system,to add service to
<br /> upgrade to a looped system, refurbish or replace existing overhead electric system poles,and evaluating replacement of a
<br /> diesel operated pump station with electrical power to the water system pump house.Additional support services for the future
<br /> preparation of an Environmental Assessment(EA)or Environmental Impact Statement(EIS) included completion of the
<br /> determination of historic eligibility of the electrical system,an archaeological inventory survey of the area of potential effect,
<br /> and the preparation of the jurisdictional waters report including documentation of identified wetlands.
<br /> Jacobs STANDARD FORM 330(REV.7/2021)114
<br /> TRACKING 4#:0063f000009AVJNAA4
<br />
|