Laserfiche WebLink
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION) <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section Efor each key person.) <br /> 12 NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Jessica Burdick, PE, PMP Project Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 23 23 <br /> 15.FIRM NAME AND LOCATION(City and S: <br /> Jacobs,Honolulu, Hawaii <br /> MS,Civil and Environmental Engineering Professional Engineer(Civil): Hawaii,#11915-C, Exp.4/30/2024 <br /> BS,Civil and Environmental Engineering Project Management Professional(PMP):#1418334 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Jessica has provided civil and environmental engineering, project management,and construction services for more than 140 DoD, <br /> municipal,and commercial projects in Hawaii over the past 17 years. Her project experience includes planning document <br /> preparation;design and construction of water,wastewater,and electrical utilities;an aviation administration building;an explosives <br /> ordinance disposal(EOD)compound;a hazardous waste storage area and wash racks;and remedial action planning,design,and <br /> construction.She has managed contracts for programming,design-build,design,construction,permitting,and regulatory <br /> compliance projects. <br /> 19.RELEVANT PROJECTS <br /> PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Statewide Freight Plan,Hawaii Department of Transportation(HDOT),Statewide,HI 2018 <br /> a. <br /> Project Engineer. Project that addressed regional transportation issues and developed tools that helped conduct quick <br /> analysis of National Performance Management Research Data Set data to give a picture of truck bottlenecks(using methods we <br /> developed with FHWA funding)and traffic reliability.The final plan describes critical freight assets with special focus on freight <br /> connectors from port,aggregate freight flow information from multiple sources,and identified critical urban and rural <br /> corridors. <br /> (1)TITLE AND LOCATION(City and State) <br /> Honolulu Rail Transit Project,General Engineering Consultant Support(GEC III), <br /> Honolulu Authority for Rapid Transportation(HART), Honolulu,HI Ongoing Ongoing <br /> -R,T'ON(B•e'scn^c;ze CP,r'r Anh Snn1'nC Rn'c <br /> Task Lead.Providing environmental and planning support to comply with the state,city,and Federal Transit Authority(FTA) <br /> b. for decision documents of the project. Reviewed contractor prepared National Environmental Policy Act(NEPA)and Hawaii <br /> Revised Statutes(HRS)Chapter 343 environmental documentation and supporting technical reports for any elements of the <br /> original 20-mile project.Assisting in all areas of environmental compliance with documented mitigation measures,decision <br /> documents for the project,permits,and all other commitments specified by the Final EIS/Record of Decision and Section 106 <br /> Programmatic Agreement. <br /> -_ - , - (2)YEAR COMPLETED <br /> Kalaupapa National Historical Park(NHP)Electrical System Rehabilitation, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> National Park Service(NPS),Kalawao County,Molokai, HI Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current f rm <br /> Project Manager.Jacobs provided planning,compliance,environmental,and engineering design services to repair and <br /> rehabilitate the failing primary and secondary electrical system infrastructure for a 1,250-acre site at Kalaupapa NHP, <br /> consisting of 30,000 LF overhead cabling and 7,800 LF of new underground cable.Completed the predesign and schematic <br /> c. <br /> design for this$576,000 project,involving rehabilitation of the Kalaupapa's overhead distribution system,to add service to <br /> upgrade to a looped system, refurbish or replace existing overhead electric system poles,and evaluating replacement of a <br /> diesel operated pump station with electrical power to the water system pump house.Additional support services for the future <br /> preparation of an Environmental Assessment(EA)or Environmental Impact Statement(EIS) included completion of the <br /> determination of historic eligibility of the electrical system,an archaeological inventory survey of the area of potential effect, <br /> and the preparation of the jurisdictional waters report including documentation of identified wetlands. <br /> Jacobs STANDARD FORM 330(REV.7/2021)114 <br /> TRACKING 4#:0063f000009AVJNAA4 <br />