Laserfiche WebLink
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION) <br /> (2)YEAR COMPLETED <br /> Honouliuli Wastewater Treatment Plant(WWTP)Secondary Upgrades, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> City and County of Honolulu,Ewa Beach,HI Ongoing Ongoing <br /> Quality Control Manager. Prepared quality management plans and facilitated quality reviews at 60%,90%design stages for <br /> the design of a$650 million upgrade to the Honouliuli WWTP to meet the requirements of a USEPA-mandated consent decree <br /> e. and increase the plant capacity to 40 million gallons per day(mgd). Design elements include:incorporating the thermal <br /> hydrolysis process(THP) prior to digestion to increase volatile solids destruction,digester gas production,and dewatered <br /> solids concentrations;enhancing the existing anaerobic digestion process;a cake receiving and storage facility for trucked-in <br /> dewatered cake from other treatment plants; new dewatering and pre-THP dewatering facilities;low-temperature belt dryer <br /> facility to produce exceptional Class A biosolids product;digester gas treatment and storage facility;and a combined heat and <br /> power(CHP)facility. <br /> Jacobs STANDARD FORM 330(REV.7/2021)113 <br /> TRACKING#:0063f000009AVJNAA4 <br />