My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005616 06.29.23 JACOBS CAT PL.4, PL.5, PL.8
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005616 06.29.23 JACOBS CAT PL.4, PL.5, PL.8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 1:44:27 PM
Creation date
8/29/2023 9:30:59 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005616
Description
JACOBS, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5, PL.8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION) <br /> F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXNAPLE PROJECT KEY NUMBER <br /> QUALIFICATIONS FOR THIS CONTRACT 1 <br /> 22 YEAR COMPLETEL <br /> PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Honolulu Rail Transit Project, Honolulu, Hawaii Ongoing Ongoing <br /> 23.PROJECT OWNER'S INFORMATION <br /> ,ONE NUMBER <br /> Honolulu Authority for Rapid Nathaniel Meddings 808.768.6237 <br /> Transportation(HART) <br /> RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> KEY RELEVPerformance Highlights: <br /> Cost:$98.7 million(All Contracts) ■ Providing program management services,including the <br /> Relevant Services: management of the work breakdown structure, budget <br /> ■ Environmental compliance with federal,state,and local staffing plan,risk register, monthly progress and status <br /> regulatory permits and procedures reports,and contract administration through the design, <br /> ■ Permitting construction,and implementation <br /> ■ Post-ROD environmental reassessment ■ Using time impact analysis to realize cost savings and on- <br /> ■ Environmental engineering island contractor estimating to develop more accurate cost <br /> ■ Environmental consulting forecasts <br /> ■ Integrated GIS platform development and data ■ Leading the development of procurement strategy,bid <br /> management documents,and independent cost estimates for major <br /> ■ Phase I and Phase II ESAs contracts <br /> ■ Environmental hazard evaluation and environmental hazard ■ Supporting administration of the Rapid Transit Stabilization <br /> management plans Agreement(RTSA)to ensure labor compliance on <br /> ■ Environmental release reporting and responses construction contracts <br /> ■ Testing and/or screening services on potentially ■ Assisting in the oversight of technical coordination,interface <br /> contaminated soil and/or groundwater management and configuration management for each <br /> ■ Stockpiling,segregating,containing,and/or transporting design and construction stage <br /> potentially contaminated soil and/or groundwater,and ■ Providing environmental and planning support to ensure <br /> store,treating,recycling,and/or disposing of as needed compliance with the state,city,and Federal Transit <br /> ■ Program management Authority(FTA)for decision documents of the project <br /> ■ Scheduling and estimating ■ Implementing and/or reviewing contractor-prepared <br /> ■ Interface management and coordination National Environmental Policy Act(NEPA)and Hawaii <br /> ■ Environmental services and planning Revised Statutes(HRS)Chapter 343 environmental <br /> ■ Design management services documentation and supporting technical reports for any <br /> ■ Management of traffic during construction elements of the original 20-mile <br /> ■ Travel demand forecasting ■ Assisting in all areas of environmental compliance to <br /> ■ Access management,modal interface comply with documented mitigation measures,decision <br /> ■ Transit Oriented Development(TOD) documents for the project,permits,and all other <br /> ■ Parking study and pedestrian access commitments specified by the final Environmental Impact <br /> ■ Roadway design, new and reconstruction Statement(EIS)/Record of Decision and Section 106 <br /> ■ Utility design and relocation Programmatic Agreement <br /> ■ Signal and Intelligent Transportation System(ITS)support ■ Supporting engineering and architectural design <br /> management services through design management,design <br /> services,quality reviews,and procurement through each <br /> design phase <br /> ■ Supporting the reduction in costs,shortening of construction <br /> time,improved safety,and minimizing impacts to the public <br /> by providing design modifications to improve rail alignment <br /> Facilitating third-party collaborations to address design and <br /> construction issues <br /> Jacobs STANDARD FORM 330(REV.7/2021) 20 <br /> TRACKING#:0063f000009AVJNAA4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.