Laserfiche WebLink
come in here with you and say, These guys will put together a programand I will assist <br />them and,‚you know, da de la la la, something that makes me a lot more comfortable <br />about where it€s going than where you€re at at this point. That€s all. <br />MCKINNEY:Right. And that€s why I think that€s the area the Department of <br />Health really makes that determination, are you guys qualified to operate this. Whereas, <br />to my understanding this Commission is, is this an appropriate use of this land. <br />KAISER:Yeah, the license, your procedure with the Department of Health <br />is, as you can attest to, a pretty rigorous process. They€re not giving out Special <br />Treatment Facility licenses without a lot of paperwork and proof. <br />ALAMEDA:Chair? And just to make it for the record, I€m not speaking on <br />behalf of Department of Health. It€s just my experience in working with them, with the <br />Child&AdolescentMentalHealthDivision,whichisprobablywhereyou€regoingto <br />have to go to. It€s going to require more than an evidence of staff. You€re going to have <br />to determine who your target population is going to be. And then if it€s going to be high- <br />functioning and compliant individuals, it€s very unlikely it€s going to fly. So it€s going to <br />be revamping of mission statement almost. <br />MCKINNEY:Well, and once again, I think it would be, you know, if we, we <br />have been speaking with them but in very loose terms because it is the chicken and the <br />egg. It has been difficult for us. You know, but, in fact, what we need is to change the <br />language of it and take out high-functioning. We are still going to screen our kids and <br />take the right kids for the right program, I mean, that€s obviously very important. <br />KAISER:One other issue is that I believe, and I don€t know exactly where in <br />the Department of Health license your requirements is that we have, that we€re, that it€s, <br />the zoning is, in effect, that we can do that there. So I think what we€re, if you can <br />enforce the things, we€re going to go to them, and they€re going to say, well, when you <br />get the Planning Commission to say it€s okay, then come back and -. <br />MCKINNEY:Yeah, we would have, I would have preferred to go to them first <br />and make sure that we can get that. Cause we have to build the facility before they will <br />even look at us. And the Department, you know, with the food service, and there are so <br />many, I mean, you€re right, Mr. Alameda, it€s a lot more than just your staff. It is, you <br />know, you have documents this thick -. <br />KAISER:Policies and procedures -. <br />MCKINNEY:Talking to all that. <br />KAISER:So we are kind of in between the chicken and the egg. <br />YUEN:Can I just -. Can I just jump in for, with a couple of comments on <br />what we€re hearing. And this is, first of all, on the licensing situation, there€s a level of <br />15 <br /> <br />