Laserfiche WebLink
.E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Jason Lau, P.E., LEED AP Principal Engineer a. TOTAL b. WITH CURRENT FIRM <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> The Limtiaco Consulting Group, Inc. Honolulu, Hawaii <br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> BS/1992/Civil Engineering HAWAII 1997/Civil Engineering (No. 9360) <br /> HAWAII 2008/LEED Accredited for New Construction <br /> HAWAII 2023/NASSCO PACP &MACP Certification <br /> HAWAII 2023/CCH DPP Certified Erosion and Sediment <br /> Control Plan Preparer <br /> HAWAII 2023/CCH DPP Certified Water Pollution Plan <br /> Preparer <br /> HAWAII 2023/EnviroCert Certified Professional in Erosion <br /> and Sediment Control <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> American Council of Engineering Companies of Hawaii <br /> American Public Works Association—Board of Directors, Past President, 2009-2014 <br /> Hawai`i Water Environment Association <br /> Water Environment Federation <br /> 19.RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kea'au Zero Waste Facility PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Kea'au, Hawaii 2018 N/A <br /> a. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Principal Engineer responsible for civil design services for the development of a new zero waste facility as part of the Agribusiness Development <br /> Corporation's initiative to expand their sustainable program of converting animal waste to product biofuel. Duties included preparation of <br /> construction documents,drainage report,and Erosion Control Report;project coordination;and services during bidding and construction. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> DOT Maui District MS4 Program—Kahului Baseyard Improvements PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Kahului, Maui On-going <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> b. Principal Engineer for civil engineering and environmental planning services for MS4 Program improvements at the DOT Kahului Baseyard, <br /> including replacement of the non-operational wash rack,installation of photovoltaic systems on all existing buildings,and increasing the capacity <br /> and operational capability of the existing fueling station. Duties include civil engineering analysis for various concept designs for a wash rack <br /> system and PV equipment storage building; environmental planning services for the development of a new parking lot layout; and project <br /> coordination with subconsultants,client,and government agencies. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Wahiawa Reclaimed Water Irrigation System PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Wahiawa, Hawai`i On-going <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> C. Principal Engineer for the design of a new wastewater reclaimed water irrigation system to deliver recycled water from the Wahiawa WWTP and <br /> raw water from Wahiawa Reservoir to the existing 3MG and 10MG reservoirs and a proposed 14 MG reservoir at Galbraith Farmland.Services <br /> include civil planning and preliminary engineering services for the interconnection of Agribusiness Development Corporation open air reservoirs <br /> at Galbraith Farmland,design of 20-and 24-inch transmission pipelines and grading at proposed valve boxes,and services during bidding and <br /> construction. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Malaekahana State Recreation Area(SRA)—Kahuku Section, Park PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Improvements 2022 On-going <br /> La`ie, Hawai`i <br /> d. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Principal Engineer to provide civil planning and design services to assess the condition of seven cabins and related infrastructure improvements <br /> at Malaekahana SRA. Responsible for the preparation of a site development planning report; demolition plans and specifications of existing <br /> cabins and auxiliary facilities; construction documents and construction cost estimates for new cabins, auxiliary facilities, and utilities; project <br /> coordination;and services during bidding and construction. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Statewide Storm Water Management Program PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Statewide, Hawaii On-going <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> e. Principal Engineer providing technical engineering services to assist the State DOT with improving the quality of stormwater runoff entering the <br /> State's drainage system. Duties include site assessment of highway embankments and drainage outfalls;selection of temporary and permanent <br /> Best Management Practices(BMPs)to minimize erosion and to capture sediment and debris; preparation of construction plans, specifications, <br /> cost estimates and applicable State and Federal permits; preparation of drainage and soil loss calculations; parcel mapping; and coordination <br /> with utility companies,public agencies,and adjacent land owners. <br /> STANDARD FORM 330(REV. 7/2021)PAGE 2 <br />