|
.E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Jason Nakata, P.E. Environmental Planner a. TOTAL b. WITH CURRENT FIRM
<br /> 15
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> The Limtiaco Consulting Group, Inc. Honolulu, Hawaii
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS/2008/Civil Engineering HAWAII 2017/Civil Engineering (No. 17843)
<br /> MBA/2017/Business Administration
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> American Council of Engineering Companies of Hawaii
<br /> American Planning Association
<br /> American Society of Civil Engineers
<br /> 19.RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> P&E Work for Waiawa 228 Reservoirs Environmental Assessment PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Waipahu, Hawaii On-going
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X] Check if project performed with current firm
<br /> a. Environmental Planner responsible for the preparation of an Environmental Assessment (EA) and Public Infrastructure Map (PIM) for three
<br /> proposed reservoirs(8.5 MGD total capacity),30-inch influent main,30-inch effluent main,access road,and appurtenances in the Waiawa Ridge
<br /> to improve operational ability to convey water from the 228'system to the Honolulu 180'System 42-inch main. Project duties include preparing
<br /> all necessary Environmental Clearances including incidental and related technical work associated with the preparation, assimilation, and
<br /> publication of the Draft and Final EA;preparing a PIM Revision Application,inclusive of consultation with agencies,civic groups,and individuals;
<br /> attendance at public informational meetings;and project management services.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Mana Drag Racing Strip, Phase 2 Improvements PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Waimea, Kauai 2016 2018
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> b.
<br /> Environmental Planner for the installation of new permanent electrical infrastructure for street lights on the Mana Drag Racing Strip.Responsible
<br /> for preparing a Final Environmental Assessment(2016)in accordance with HRS Chapter 343; preparing construction plans,specifications, and
<br /> cost estimate; and obtaining necessary permit applications and exemptions including NPDES, NOI Form C, Shoreline Setback Determination
<br /> Application,Special Management Area Minor Permit,and Conservation District Use Permit Site Plan Approval.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Preliminary Engineering Study and Environmental Assessment for PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> `Aina Haina Reservoir No.2 2016 N/A
<br /> Honolulu, Hawai`i
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X] Check if project performed with current firm
<br /> C.
<br /> Environmental Planner to determine the suitability of the remaining land area within the Board of Water Supply's'Aina Haina Reservoir No. 1 and
<br /> Booster Station property to site a second 0.5 million gallon reservoir. Responsible for the preparation of the Preliminary Engineering Study and
<br /> preparation of a Final Environmental Assessment (2016) in accordance with HRS Chapter 343. Duties included conducting a visual impact
<br /> evaluation from the affected public viewpoints, identifying permit requirements, preparing cost estimates and project timelines, overseeing the
<br /> soils survey and structural analysis,and attending Neighborhood Board meetings.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Statewide Storm Water Management Program—Environmental PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Assessment for Kakoi Base Yard Improvements 2014 N/A
<br /> Honolulu, Hawai`i
<br /> d. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> Environmental Planner responsible for the preparation of an Environmental Assessment(EA), pursuant to HRS Chapter 343, for the proposed
<br /> O'ahu District Office Base Yard Canopy Extension and Maintenance Storage Building project. Project duties encompass all facets of the EA
<br /> process, including agency consultation and public outreach, preparation and publication of the Draft and Final EA, and identifying applicable
<br /> permits required for the project.The Final EA was published in 2014.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kalaeloa Seawater Desalination Facility Design-Build-Operate- PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Maintain On-going
<br /> Ewa,O`ahu, Hawaii
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> e.
<br /> Environmental Planner to assist the BWS with the development of a Request for Proposal (RFP), selection of the best-valued proposal, and
<br /> execution of a Service Agreement with a DBOM contractor qualified to convert a 20-acre property into a seawater desalination facility. Duties
<br /> include coordination with the BWS and permitting agencies to develop a permitting approach (HRS Chapter 343,SHPD, SMA, County Zoning,
<br /> Water Use Permit, HECO coordination),preparation of an UIC Well Status Report,water sampling coordination,and confirming required permits
<br /> and preparing a schedule of agency coordination meetings for non-DBOM permit activities consistent with the permit strategy.
<br /> STANDARD FORM 330(REV.7/2021)PAGE 2
<br />
|