Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Claire Oshiro Environmental Planner a. TOTAL b. WITH CURRENT FIRM <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> The Limtiaco Consulting Group, Inc. Honolulu, Hawai` <br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BA/1992/General Arts and Architecture N/A <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> American Council of Engineering Companies of Hawaii <br /> National Association of Environmental Professionals <br /> 19.RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> New Administration and Base Yard Facility in West Hawai`i for PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> DLNR 2021 N/A <br /> a. West Hawai`i, Hawai`i <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Environmental Planner for the preparation of a Final Environmental Assessment(2021)in accordance with HRS Chapter 343 for a new facility in <br /> West Hawai'i to house staff administrative offices and base yard services for DLNR. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kea'au Zero Waste Facility PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Kea'au, Hawai`i 2018 N/A <br /> b. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Environmental Planner for the development of a new zero waste facility as part of the Agribusiness Development Corporation's initiative to expand <br /> their sustainable program of converting animal waste to product biofuel.Duties included preparation of a Final Environmental Assessment(2018) <br /> in accordance with HRS Chapter 343. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Wahiawa Reclaimed Water Irrigation System PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Wahiawa, Hawai`i On-going <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> C. Environmental Planner to identify, evaluate, and recommend an alternative to deliver recycled water from the Wahiawa WWTP and raw water <br /> from Wahiawa Reservoir to the existing 3MG and 10MG reservoirs and a proposed 14 MG reservoir at Galbraith Farmland. Services include <br /> preparation of a Final Environmental Assessment (2022) in accordance with HRS Chapter 343 and identification of applicable permits and <br /> preparation of permit applications, including USACE permits, CWA 401 water quality certification, NPDES, CDUP,SCAP, SDWP,and Use and <br /> Right-of-Way permits or easements. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pohoiki Boat Ramp Dredging of Volcanic Debris and Hazard PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Mitigation On-going <br /> Puna, Hawai`i <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> d. <br /> Environmental Planner responsible for environmental planning and permitting services to excavate and dredge volcanic debris and black sand <br /> from the entrance channel and turning basin for the Pohoiki Boat Ramp. Duties include preparation of a Final Environmental Assessment in <br /> accordance with HRS Chapter 343 and identification of applicable permits and preparation of permit applications, including CWA 404 USACE <br /> permit, NPDES NOI Form C authorizing discharges of stormwater associated with construction activities and stockpiling permits, HRS 6E SHPD <br /> consultation,and Grading Permit from the County of Hawai'i. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Maui Office Annex Building PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Wailuku, Maui 2016 2019 <br /> e. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Environmental Planner responsible for preparing the Final Environmental Assessment (2014) in accordance with HRS Chapter 343 for the <br /> replacement of an aging administration building. Project efforts included an evaluation of the existing structure and infrastructure conditions.The <br /> planning and engineering effort addressed the office space requirements for various State divisions. <br /> STANDARD FORM 330(REV.7/2021)PAGE 2 <br />