My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005625 06.29.23 WILSON OKAMOTO CORP CAT PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005625 06.29.23 WILSON OKAMOTO CORP CAT PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 2:38:07 PM
Creation date
8/29/2023 9:16:45 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005625
Description
WILSON OKAMOTO CORP, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Harlee Meyers Planner a.TOTAL b.WITH CURRENT FIRM <br /> 1 1 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> MURP, Urban and Regional Planning, University of Hawaii at <br /> Manoa, 2021 <br /> B.S., Global Environmental Science, University of Hawaii at Manoa, <br /> 2018 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Makalawena Integrated Resource Management Plan Environmental PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Assessment&Entitlements, Kona, HI Active -- <br /> a. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Kamehameha Schools (KS)desires to formulate and implement an Integrated Resources Management Plan for property it owns <br /> at Makalawena makai of Queen Ka'ahumanu Highway. The 353 acre parcel contains unique and sensitive natural, cultural and <br /> historical resources. Harlee is assisting with the preparation of an Environmental Assessment. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kahekili Highway Slope Repair PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kahakuloa, HI <br /> b. Active -- <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The County of Maui is proposing roadway repairs along 1,300 feet of Kahekili Highway Milepost 15. Improvements include <br /> repairs to slope and pavement edge failure. Harlee is assisting with the preparation of environmental assessment and permits. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waipahu Refuse Facility &Convenience Center PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Waipahu, Oahu, HI Active -- <br /> C (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Harlee is preparing an Environmental Assessment to meet Chapter 343, HRS requirements. The City is proposing to convert the <br /> existing Waipahu Incinerator facility into a multi-use refuse division facility to accommodate larger public demand of the Leeward <br /> Oahu; office and maintenance shop; and training/education center. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimea Canyon Drive/Kokee Road Improvements, Phase 2 (MP 4.6 <br /> and 4.10) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Waimea, HI Active 2A-Awarded <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> HDOT proposes to upgrade/improve existing shoulders and guardrail systems along Waimea Canyon Road. State and federal <br /> funds will be used for the project, thereby triggering compliance with state environmental review laws and federal cross-cutting <br /> authorities. Harlee is assisting with preparing and processing permits including, but not limited to HRS Chapter 343 <br /> Environmental Assessment(Exemption), NHPA Section 106 consultation, and ESA, Section 7. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Puuwai Momi Housing Redevelopment Due Diligence PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Honolulu, HI 2023 -- <br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Assisting with the preparation of a due diligence report for redevelopment of housing development in Halawa. The existing <br /> development consists of 260 units and the State is proposing to add 1,000 affordable housing units. Harlee is conducting research <br /> and data gathering of information related to the project site environs and will be consulting with various agencies to discuss the <br /> project an identify required permits and entitlements required for the project. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.