|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Brian Lock, P.E. Vice President & Director of Civil a.TOTAL b.WITH CURRENT FIRM
<br /> Engineering Group 28 20
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, University of Hawaii at Manoa, 1994 PE-9867, Hawaii, Civil Engineering, 1999
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu, 12/31/2023 American Society of Civil Engineers
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2023
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Keaau-Pahoa Road Shoulder Improvements, Phases 1 &2 PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Puna, Hawaii Phase 1 —2015 Phase 1 -2015
<br /> Phase 2-2018 Phase 2—2018
<br /> a• (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the design of the widening of a 2-mile portion if Keaau-Pahoa Road by installing an additional northbound lane;
<br /> widening Waipahoehoe Bridge; extending existing culverts; and installing pavement marking, striping and signing. The project
<br /> converted the shoulder lane into a permanent travel lane. Drainage improvements included lengthening and repair/replacement of
<br /> existing culverts, and the installation of a new culvert to alleviate flooding conditions.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> H-1 Guardrail &Shoulder Improvement, Middle Street to
<br /> Punchbowl Street Off-Ramp PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Oahu, HI 2020 2019
<br /> b.
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the design of Interstate Route H-1 Guardrail and Shoulder Improvements. The project entails the replacement
<br /> of existing guardrail systems and crash cushions, and construction of new concrete barrier walls along the freeway between Middle
<br /> Street and the Punchbowl Street Off-ramp. ECC: $6 Million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Lahaina Bypass, Phase 1B-2(Design-Build) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Lahaina, HI 2018 2018
<br /> c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the design of the third phase of the overall Lahaina Bypass (Honoapiilani Highway Realignment) project. The
<br /> civil design services include design and layout of the plan and profile of the new highway and preparing site plans, grading plans,
<br /> typical sections, erosion control plans, pavement marking and sign plans, cross sections, hydraulic report, and drainage plans.
<br /> Culvert design incorporated creative hydraulic techniques to regulate flow given limited available right-of-way. ECC: $39 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Auahi Street Improvements,Ward Village PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Oahu, HI Phase 1-Active Phase 1 —Under
<br /> Phase 2—In Permitting Construction
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> d. Project Manager for the preparation plans to redevelop Auahi Street from current 4-lane road to a Pedestrian and Bicycle friendly
<br /> 2-lane road that realigns to connect with Pohukaina Street west of Ward Avenue consistent. Roadway design includes constructing
<br /> near existing grades, 44-foot curb to curb with two travel lanes, center turn lane, two bike lanes, and bus stops. A relocated mid-
<br /> block crosswalk with relocated traffic signal will provide pedestrian access across Auahi Street.Associated design includes a new
<br /> signalized intersection at Ward Ave, grading, curb ramp, landscaping, bike lanes with buffers, pavement marking and signs,water
<br /> meter adjustments, and fire hydrant relocations
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 12
<br />
|