My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005625 06.29.23 WILSON OKAMOTO CORP CAT PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005625 06.29.23 WILSON OKAMOTO CORP CAT PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 2:38:07 PM
Creation date
8/29/2023 9:16:45 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005625
Description
WILSON OKAMOTO CORP, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Glenn Kuwaye, P.E., LEED AP Vice President & Director of Civil a.TOTAL b.WITH CURRENT FIRM <br /> Engineering 23 18 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, Santa Clara University, 2000 LEED Accredited Professional, 2009 <br /> PE-11817, Hawaii, Civil Engineering, 2005 <br /> PE-65310, California, Civil Engineer, 2003 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Member, Japanese Chamber of Commerce <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2023 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2023 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kawaihau-Mailihuna-Hauaala Complete Streets 1A <br /> East Kauai, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Planning &Design— Under Construction <br /> 2021;Active <br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for preparation of construction plans to improve roadways in East Kauai. The intent of the project is to improve <br /> the safety and operation of the 5-way intersection of these three streets, and to provide safe routes for students to walk or bike <br /> to Kapa'a Elementary School, Kapa'a High School and St. Catherine School as well as for residents to get around their <br /> neighborhood with multiple transportation modes. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Salt Lake/Moanalua Public Library—Parking Lot Improvements <br /> Moanalua, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2020 2020 <br /> b. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation of construction plans for demolition, site layout, and striping for the repaving of existing <br /> parking lot. The repaving consisted of a cold plane and overlay to match the existing AC pavement grades and thickness. ECC: <br /> $250K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> lao Valley State Monument Phase 2—Permanent Repairs PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> lao, HI 5/2023 5/2023 <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> C. The lao Valley State Monument Park sustained flood damage due to the September 2016 heavy rains on Maui. The heavy rains <br /> caused the Wailuku River running through the park to rise, triggering flood damage and landslides along the banks of the park. <br /> First phase involved design and construction of remedial measures to stabilize the stream bank to avert further undercutting. <br /> Phase 2 involves permanent repairs to address the long-term stability of the parking lot. This will include installation of a series <br /> of 30-foot reinforcing bars grouted into drilled holes to stabilize the slope and placement of shotcrete and sculptured to improve <br /> the appearance of slope face. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> General Hydraulic Engineering Services, Maui and Molokai <br /> PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active -- <br /> d. <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for overseeing the assessment of State and County owned bridges on the islands of Maui and Molokai. Scope <br /> includes assessing bridges and developing qualitative assessment/evaluation to determine which bridges are scour susceptible <br /> and require further analysis. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.