E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Lance Oyama, P.E. Sr. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 51 26
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, University of Hawaii at Manoa, 1978 PE-5309, Hawaii, Civil Engineering, 1982
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> American Society of Civil Engineers (Lifetime Member)and American Wastewater Association
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kapolei Corporation Yard, Phase 4 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Honolulu, HI Design -2020 Under Construction
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Phase 4 of the project will accommodate an access road, a painting/welding building and a fuel station canopy on approximately
<br /> 1.5 acres. The development of the site improvements will involve the removing and disposing portion of an existing dirt mound,
<br /> grading for the new building, paving, constructing the infrastructure including water distribution system, sewer lines, &drain lines,
<br /> hardscaping, and landscaping. Mr. Oyama is the Project Manager for the design and preparation of construction plans.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> University of Hawaii Campus Center Expansion and Warrior PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Recreation Center, Honolulu, HI 2014 2014
<br /> b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Civil Engineer for the expansion of the campus center at the University of Hawaii at Manoa. The project was implemented
<br /> in three phases, including renovations to the existing Hemenway Hall, campus center renovations, and the new Warrior Recreation
<br /> Center, encompassing 56,100 square ft. Civil site improvements included sewer, water and drainage systems for the new
<br /> Recreation Center. Estimated construction cost was approximately$30 million.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kapolei Interchange Phase 2 PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kapolei, Oahu, HI 2021 2020
<br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the preparation of construction plans for Kapolei Interchange Improvements, Phase 2. The Project is located
<br /> on Interstate Route H-1, between the existing Makakilo Interchange and existing Palailai Interchange. The Kapolei Interchange
<br /> provides an off ramp for West bound traffic on H-1 to access Wakea Street via a system of at grade ramps,elevated bridge/overpass
<br /> roadway, and connections to Farrington Highway.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Honolulu Rail Transit Guideway and Transit Stations,Airport
<br /> Section (Design-Build) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Pearl City, Oahu, HI Active Under Construction
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> d• Sr. Civil Engineer for the design of the Honolulu Rail Transit Guideway and Transit Stations, Phase 3 Airport Section. Phase 3
<br /> consists of the construction of 5.2 mile long grade separated fixed guideway rail transit system, including four transit stations,
<br /> beginning from Aloha Stadium to Middle Street. Scope of work includes civil design of widening of the roadways to accommodate
<br /> the new elevated guideway and support columns. Improvements include modifying, relocating or providing new medians,
<br /> sidewalks, bus stops, intersections,curb ramps,driveways. Work includes developing roadway demolition plans,site plans,grading
<br /> plans, pavement marking and sign plans, typical sections, utility plans, drainage plans and various associated details.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 15