My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005625 06.29.23 WILSON OKAMOTO CORP CAT PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005625 06.29.23 WILSON OKAMOTO CORP CAT PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 2:38:07 PM
Creation date
8/29/2023 9:16:45 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005625
Description
WILSON OKAMOTO CORP, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Richard Harada, P.E. Sr. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM <br /> 39 35 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, University of Hawaii at Manoa, 1982 PE-6624, Hawaii, Civil Engineering, 1989 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Public Works Association, North American Society of Trenchless Technology, Hawaii Water Environment Federation <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2023 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2023 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kauai High School Athletic Courts, Parking and Drainage <br /> Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Lihue, HI Design—12/2022 Construction to start soon <br /> a. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation construction plans for new athletic courts to include tennis courts; reconfiguration of front <br /> parking are to create a safer drop-off and improve traffic circulation; and drainage improvements to include appropriate channeling <br /> for stormwater runoff to minimize flooding from heavy rain events. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hart Street-Waiakamilo Sewer Improvements <br /> Honolulu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Design—2020 Under Construction <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation of design and construction plans to replace existing sewer line along Hart Street and <br /> Waiakamilo Street to Dillingham Boulevard. Design includes new 6-inch sewer line along Nimitz Highway, new 8-, 10-and 12- <br /> inch sewer lines along Hart Street which will replace the existing 24-inch sewer line; and new 24-inch sewer line at the <br /> intersection of Dillingham Boulevard and Waiakamilo Road. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kaneohe-Kailua Wastewater Conveyance&Treatment Facilities <br /> Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Windward Oahu, HI Planning 2013 2018 <br /> Civil—2021 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> c. Project Manager for the planning and preparation of a Facilities Plan for the area serviced by the Kailua Wastewater Pre-Treatment <br /> Plant. The project included assessing existing conditions, projecting future population and land use demands on wastewater, and <br /> providing projects to address current and future deficiencies. It also included extensive work on a sewer flow analysis model to <br /> evaluate the system hydraulics, particularly the wet weather infiltration and inflow during peak storm events. Managed the design <br /> of construction plan for a 3-mile underground sewer tunnel from Kailua WWTP to Kaneohe Pre-Treatment Facility. Mr. Harada was <br /> also the Project Manager for the design phase of the project. ECC: $175 Million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Rehabilitation of lao Stream Bridge along Waiehu Road <br /> Wailuku, Maui, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2015 2015 <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manage for preparing construction plans for various roadway and bridge improvements along a portion of Waiehu Beach <br /> Road. The project entails the addition of roadway and bridge widening, upgrade of the bridge railing, bicycle lanes and ADA <br /> approved curb ramps with ADA approved separated sidewalk, and approaches to conform to DOT HWY, FHWA and AASHTO <br /> standards. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.