E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Todd Yonamine, P.E. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 30 1
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Bachelor of Science—Civil Engineering (B.S.C.E.) PE-9212, Civil Engineering, Hawaii, 1997
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2023
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2023
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hala`ula Well Development Phase 2
<br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2019 2023
<br /> a• (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ['Check if project performed with current firm
<br /> Description: Design for the installation of 700 gpm pump and 200 hp motor, connecting pipeline, 0.5 MG reservoir, control
<br /> building, access roadway,site work and appurtenances. Construction cost: $12.8M approx.
<br /> Role: Project manager&design engineer
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Pu'unene Industrial Subdivision Water System
<br /> Kihei, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2017 2018
<br /> b. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br /> Description: Design for the installation of 2- 165 gpm pumps and 15 hp motors, connecting pipeline, 0.5 MG reservoir, control
<br /> building, fire booster station, access roadway,site work and appurtenances. Construction cost: $4.1M approx. Role: Project
<br /> manager&design engineer
<br /> (1)TITLE AND LOCATION(City and State)
<br /> Ka`upulehu Well No.8 Pump&Connecting Pipeline (2)YEAR COMPLETED
<br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2016 2017
<br /> C. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br /> Description: Design for the installation of 450 gpm pump and 250 hp motor, connecting pipeline, control building, access roadway,
<br /> site work and appurtenances. Construction cost: $2.1M approx.
<br /> Role: Project manager&design engineer
<br /> (1)TITLE AND LOCATION(City and State)
<br /> Waikoloa Tanks 300-2 and 300-3 (2)YEAR COMPLETED
<br /> South Kohala, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2006 2008
<br /> d. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br /> Description: Design for the installation of 2-2.5 MG reservoirs, connecting pipelines, altitude valve station, site work and
<br /> appurtenances. Construction cost: $3.9M approx.
<br /> Role: Project manager&design engineer
<br /> (1)TITLE AND LOCATION(City and State)
<br /> Princeville AG Subdivision Tank (2)YEAR COMPLETED
<br /> Princeville, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2003 2004
<br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br /> e. Description: Design for the installation of 0.5 MG reservoir, connecting pipelines, altitude valve station,site work and
<br /> appurtenances. Construction cost: $1.1M approx.
<br /> Role: Design engineer
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 17