|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Brennan Nacario, P.E. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 11 10
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.S., Civil Engineering, Santa Clara University, 2013 PE-17830, Hawaii, Civil Engineering, 2017
<br /> B.S., Civil Engineering, Santa Clara University, 2012
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2023
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2023
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Halawa View Apartments, Phases 2 &3
<br /> Aiea, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2/2023 Under Construction
<br /> a.
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the preparation of construction plans for the development of a 25-story, 302-unit apartment building in
<br /> Halawa. The existing site contains existing multiple apartment buildings. The construction plans included demolition and mass
<br /> grading site, as well as construction plans for the new building (water, sewer, drainage, ingress/egress, grading, etc.)
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Anaha,Ward Village
<br /> Kakaako, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2017 2017
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil Engineer for the development of civil design and construction documents for the proposed Block"K", a residential tower with
<br /> retail space. The project site is located at the corner of Auahi Street and Kamakee Street next to Auahi Shops and parking
<br /> garage. Scope included the preparation of schematic plans, preliminary, and final construction plans. ECC: $401 Million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HECO Ductline Replacement,Various Locations
<br /> Various locations, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active On-going
<br /> C.
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the design of cable replacements in compliance with applicable City, State and or private utility guidelines
<br /> and HECO standards. Plan preparation includes civil and electrical drawings, obtain agency approvals, cost estimate quantities
<br /> and as built plans.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hawaii Gas Improvements-Keehi Lagoon
<br /> Honolulu HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active --
<br /> d.
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the design and preparation of construction plans for relocation of gas line.A 6"gas line is currently mounted
<br /> on the existing mauka utility bridges spanning Moanalua Stream and Kalihi Stream. The CCH is demolishing the existing mauka
<br /> utility bridges which triggers the relocation of the existing 6"gas line.The line will be relocated to the existing makai utility bridges.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Marriott Vacation Resort Waikiki at 2080 Kalakaua Avenue(formerly
<br /> Niketown) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Waikiki, HI 2023 Under Construction
<br /> e• (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> The former Niketown in Waikiki is proposed to be converted to a 7-story mixed-use residential timeshare with 119 units, including
<br /> retail on the ground level. The site encompasses approximately 0.9 acres and is currently a 4-story commercial property. Mr.
<br /> Nacario is the Project Manager for preparation of construction plans, including demolition site layout, grading, and traffic control
<br /> plans. Scope also included preparing sewer connection application and water adequacy request letter.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 19
<br />
|