E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Kevin Higashi, P.E. Associate Civil Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 14 14
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, University of Hawaii at Manoa, 2009 PE-16025, Civil Engineering, Hawaii, 2014
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2023
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2023
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Honoapiilani Highway Phase 1A Realignment, Keawe Street
<br /> Extension to Lahainaluna Road(Design-Build) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Lahaina, HI 2013 2013
<br /> a.
<br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Sr. Civil Engineer for the design of the first phase of the Lahaina Bypass. The civil design services included highway layout &
<br /> grading, hydrology, hydraulics, utility relocations, ADA improvements and roadside design. The project included design of a new
<br /> concrete bridge for Kahoma Stream crossing and a single space grade se aration structure at Lahainaluna Road.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hana Highway Improvements, Huelo to Hana, Phase 2A and 2B/2C
<br /> Hana, Maui, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2014 &2016 2017&2020
<br /> b• (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Sr. Civil Engineer for the preparation of designs, plans, specifications, and cost estimates for roadside improvements along Hana
<br /> Highway from Mile Post (MP) 8.1 in Huelo to MP 21.5 in Nahiku. Improvements include stabilizing roadside rock retaining walls
<br /> with new soil nail retaining walls, repair/repave pavement cracking, installing drainage improvements, and installing/ upgrading
<br /> guardrails. ECC 2A: $2 million ECC 2B/2C: $5.5 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Keaau-Pahoa Highway Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Puna, Hawaii
<br /> 2015 &2018 2015&2018
<br /> C (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Sr. Civil Engineer for the design of the widening of a 2-mile portion of Keaau-Pahoa Road by installing an additional northbound
<br /> lane;widening Waipahoehoe Bridge;extending existing culverts;and installing pavement marking,striping and signing. The project
<br /> converted the shoulder lane into a permanent travel lane. Drainage improvements included lengthening and repair/replacement of
<br /> existing culverts,and the installation of a new culvert to alleviate flooding conditions. Phase 2 included installation of a traffic signal
<br /> and the restriping of the project corridor to a permanent 4-lane configurations. ECC: $22 Million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Lahaina Bypass, Phase 1B-2(Design-Build) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Lahaina, Maui, HI 2018 2018
<br /> d. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Sr. Civil Engineer for the design of the third phase of the overall Lahaina Bypass (Honoapiilani Highway Realignment) project.
<br /> Responsible for the design and layout of the plan and profile of the new highway and preparing pavement marking and sign plans
<br /> and cross sections. Design includes a bridge supported by geosynthetic reinforced soil (GRS)abutments. Culvert design
<br /> incorporated creative hydraulic techniques to regulate flow given limited available right-of-way. ECC: $39 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> P-209 Dry Dock No. 3(future No.5)(NAVFAC Pacific)
<br /> JBPHH, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active Awarded
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> e. Sr. Civil Engineer preparing Design-Bid-Build documents. Preparing designs related to landside site features and below grade wet
<br /> utilities (water, drainage, and gravity sanitary sewer). Also establishing project design storms for site and dry dock storm drainage
<br /> system design.