Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Chase Kanekuni Civil Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 5 5 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, Purdue University, 2018 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Collection System Maintenance(CSM) Pearl City Warehouse <br /> Pearl City, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active -- <br /> a' (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Chase is assisting with preparing construction plans for site grading, drainage, water, sewer, and egress/ingress. The CCH is <br /> proposing to construct a new warehouse in the Pearl City Industrial Park. The lot encompasses approximately 1 acre. The <br /> warehouse will house supplies and equipment(pumps, pipes, sand bags,etc.) needed in the event of an emergency. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Wahiawa Civic Center-Design PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Wahiawa, HI <br /> Active -- <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The new complex will be sited on approximately 4 acres and will consolidate various State and City services, including a civil <br /> center,judiciary,state office complex, public library and parking. Chase prepared a Preliminary Engineering Report for the <br /> Chapter 343, HRS EIS. Chase is assisting with the preparation of construction drawings for site water,wastewater, demolition, <br /> grading, erosion control, and egress/ingress. ECC: $76M <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waikoloa Affordable Housing <br /> Waikoloa, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active -- <br /> c. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The proposed affordable housing project encompasses approximately 25 acres. The development will consist of 12 residential <br /> buildings serving 228 residential units. Civil engineer preparing construction plans for site water,wastewater, grading, roadway, <br /> and drainage. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> University of Hawaii Value Added Product Development Center <br /> Wahiawa, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 3/2021 Under Construction <br /> d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Civil engineer assisting with the preparation of construction plans utilities (water, sewer, storm drainage) demolition, grading, site <br /> layout (parking improvements and sidewalks). The University of Hawaii is proposing the development of a new vocational <br /> school/educational facility for Leeward Community College in Wahiawa. The project site encompasses approximately 1.5 acres. <br /> The facility will serve as a multi-purpose facility for activities including, but not limited to, festivals, farmers markets, tasting events, <br /> merchandising for food products from the facility. Estimated construction cost: $12 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Manana Corporation Yard PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, HI <br /> Active Under Construction <br /> e. <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Civil engineer assisting with the preparation of construction plans for the redevelopment of the City's Manana Corporation Yard. <br /> The project site will accommodate new facilities for the Department of Facility Maintenance, including new warehouse, parking <br /> structure, and storage areas. He also prepared and processed NPDES permit. Estimated construction cost: $25.2 million <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 26 <br />