|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Josh Inaba Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 4 4
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, Purdue University, 2019
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> University of Hawaii Community College Value Added Product
<br /> Development Center PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Wahiawa, HI 3/2021 Under Construction
<br /> a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil engineer for the preparation of construction plans for utilities (water, sewer, storm drainage)demolition, grading, site layout
<br /> (parking improvements and sidewalks). University of Hawaii is proposing a new vocational school/educational facility for Leeward
<br /> Community College in Wahiawa. The project site encompasses approximately 1.5 acres. The facility will serve as a multi-
<br /> purpose facility for activities including, but not limited to,festivals, farmers markets, tasting events, merchandising for food
<br /> products from the facility. Estimated construction cost: $12 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hawaii Law Enforcement Federal Credit Union
<br /> Honolulu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> b. 2021 2021
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil engineer for the preparation of construction plans for site,water, sewer, ingress/egress, drainage and grading. The existing
<br /> site will be redeveloped to accommodate a credit union. Estimated construction cost: $6.5 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> University of Hawaii Multi Family Mixed Use Project
<br /> Honolulu HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active
<br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Josh is assisting with the preparation of construction plans for demolition,site layout, grading, erosion control,water, sewer,
<br /> drainage and egress/ingress. UH is proposing a new mixed-use housing project in the former NOAA site in Manoa. The project
<br /> will consist of two towers with approximately 315 units in varying sizes. ECC: $157 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Innovation Center and Residences for Innovative Student
<br /> Entrepreneurs(RISE) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, HI Active Under Construction
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> The University of Hawaii is developing a mixed-use student housing project envisioned to bring an integrated live, learn,work,
<br /> innovation. The facility will consist of 140,000 SF with housing, common areas, services areas, office/administration and on-site
<br /> parking. Josh prepared construction plans for site utility improvements including water, sewer, ingress/egress, drainage, grading
<br /> and demolition. ECC: $70 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> City&County of Honolulu's Leeward Baseyard PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Ewa, HI
<br /> Active Under Construction
<br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil engineer preparing construction plans for the development of a new baseyard at James Campbell Industrial Park.The
<br /> project will include a single story administration building, employee parking, covered parking bays for refuse truck fleet and other
<br /> ancillary improvements. Construction plans include site demolition, site layout, grading,water, sewer and drainage.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 27
<br />
|