Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11. NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Marvin D. Heskett,III Senior Chemist a.TOTAL b.WITH CURRENT FIRM <br /> 33 9 <br /> 14. FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Biochemistry, California Polytechnic • Certified Asbestos Inspector, HIASB-4631 <br /> University at San Luis Obispo • Certified Lead Risk Assessor/Inspector, PB-1150 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • OSHA Initial HAZWOPER Training, 40-HR • Sampling for Defensible Environmental Decisions, Basic <br /> • OSHA Refresher Training, 8-HR and Advanced <br /> • OSHA Construction Safety and Health Training, • Shipley Group NEPA Training <br /> 30-HR • Advanced Systems QA/QC 40-hour Course <br /> • Construction Safety Hazard Awareness Training • E3 Data Quality Objective <br /> for Contractors, 40-HR • Maritime Security Awareness Training(MARSEC) <br /> • Hazardous Waste Site Supervisor Training • Bloodborne Pathogens, First Aid, CPR,and AED Training <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Preconstruction Activities for the Applicable Monitoring PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> and Assessment Plan for the Honolulu Rail Transit Project, 2019 - <br /> Waiawa Tributary and Waiawa Stream WQC0789,Pearl <br /> City,Oahu,Hawaii <br /> a. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Completed preconstruction monitoring in compliance with an AMAP for construction within the U.S. <br /> waterway of Waiawa Stream, prior to the construction of a concrete pier within the high-water mark. This is <br /> the first of three phases of stream monitoring to ensure construction does not impact stream water quality. <br /> Fee: $494,104. Role: Senior Chemist. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Navy Stormwater National Pollutant Discharge Elimination PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> System,Compliance Sampling,Commander Navy Region Ongoing - <br /> Hawaii,JBPHH,Oahu,Hawaii <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Completed NPDES stormwater sampling for CRNH. E2 created supporting documents including a Quality <br /> assurance plan, health and safety plan, stormwater monitoring plan and a stormwater monitoring workbook, <br /> b. collection of surface flow samples during the initial first flush of stormwater during a representative storm <br /> event from 32 separate monitoring points throughout U.S. Navy facilities on Oahu, and analysis of the <br /> stormwater samples for contaminants. Sample collection is accomplished through setup and use of <br /> automated samplers and portable samplers and telemetry. Individual storm event reports are generated as <br /> well as an end of year annual monitoring report. E2 conducted a site visit and stormwater collection point <br /> measurements, field setup and sampling, creation of stormwater inlet collection systems, including stainless <br /> steel fabrications, QA Review of Stormwater Reports, and generation of a yearend annual report. Fee: <br /> $426,480 (annually). Role: Senior Chemist. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Water Quality Monitoring,Rip-Rap Repair and Floating PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Dock,USCG Station Nawiliwili Small Boat Harbor,Lihue, 2016 - <br /> Kauai,Hawaii <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> C. Completed an AMAP to monitor impacts on harbor water quality from a U.S. Coast Guard in-water <br /> construction project. E2 created a work plan, established baseline conditions by monitoring water quality <br /> parameters before construction, monitored water quality from a vessel in and around the construction <br /> project, assessed the final water quality post construction, and generated a final report. Fee: $60,000. Role: <br /> Assistant Project Manager/Senior Chemist. <br /> f COUNTY OF HAWAII-FY24- PAGE 9 <br />