|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Bernice M.Balete,P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 29 13
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering,University of Hawaii at • Professional Engineer, Hawaii- Civil No. 10186
<br /> Manoa • Certified Asbestos Project Designer/Inspector, HIASB-0499
<br /> • Certified Lead Risk Assessor/Project Designer, PB-0449
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA Initial HAZWOPER Training, 40-HR • Maritime Security Awareness Training(MARSEC)
<br /> • OSHA Refresher Training,8-HR • Hazardous Waste Site Supervisor Training
<br /> • OSHA Construction Safety and Health Training, 30-HR • Bloodborne Pathogens, First Aid, CPR, and AED
<br /> • Construction Safety Hazard Awareness Training for Training
<br /> Contractors, 40-HR
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> BWS Kawela 228 Reservoir,Kapolei 215 Reservoir,and PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Wahiawa 1361 Reservoirs No. 1 &2 Facility Repair and 2017 -
<br /> Repainting,Oahu,Hawaii
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a. Conducted asbestos and lead paint surveys at the Kailua Heights and Waimanalo Booster Pump Stations,
<br /> prepared letter reports documenting sampling and results, prepared specifications for addressing the
<br /> handling and disposal of hazardous materials during demolition/construction. E2 also prepared NPDES
<br /> Permit Applications for the Kapolei and Kawela Reservoirs project sites. Fee: $28,570. Role: Field
<br /> Engineer/Project Manager.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Environmental Site Assessments,Kapalama Container PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Yard,Honolulu Harbor,Oahu,Hawaii 2014 Estimated 2024
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Completed a Phase II Environmental Site Assessment (ESA) of the proposed Kapalama Container Yard site to
<br /> determine the environmental history and condition of the proposed project site. Completed document
<br /> reviews and site assessments and prepared a Work Plan for the Phase II ESA. Soil, sediment, groundwater,
<br /> b' concrete, and soil gas sampling was completed.Additional sampling of the University of Hawaii Marine Center
<br /> buildings for hazardous building materials including asbestos and lead paint was also completed. The results
<br /> of the sampling are presented in an Environmental Hazard Evaluation (EHE) report. Contamination issues
<br /> that may affect the construction of the container yard are being addressed in an Environmental Hazard
<br /> Management Plan (EHMP) that was prepared by E2. All work was coordinated, reviewed, and approved by
<br /> HDOH. Fee: $500,000. Role: Senior Environmental Engineer. *2023 ACECH ENGINEERING EXCELLENCE
<br /> AWARD*
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Integrated Solid Waste Management Plan,JBPHH, Oahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Hawaii 2014 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Prepared an Integrated Solid Waste Management Plan (ISWMP) to accomplish the following: define and
<br /> d. document the installation's current ISWMP; establish goals for improving solid waste management; identify
<br /> specific actions required to achieve the plan goals; promote compliance with applicable Federal, DOD, and
<br /> local solid waste management regulations and policies; and evaluate alternative designs for future solid waste
<br /> management. Responsibilities included field work (including waste stream assessment), data collection and
<br /> evaluation, and ISWMP preparation. Fee: $557,999. Role: Assistant Project Manager/Senior Environmental
<br /> Engineer.
<br /> COUNTY OF HAWAII-FY24- PAGE 8
<br />
|