|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Joshua B.Agpaoa,E.I.T. Staff Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 5 5
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, University of Hawaii at • Certified Asbestos Inspector, HIASB-4791
<br /> Manoa • Certified Risk Assessor/Lead Inspector, PB-1137
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA Initial HAZWOPER Training, 40-HR • OSHA Construction Safety and Health Training, 30-HR
<br /> • OSHA Refresher Training,8-HR • Bloodborne Pathogens, First Aid, CPR,and AED Training
<br /> 18.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Non-Domestic Wastewater Management Plan,JBPHH, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Oahu,Hawaii Ongoing -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify, characterize, and quantify non-domestic wastewater
<br /> discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment Plant (WWTP).
<br /> a. Coordinated site visits to and conducted interviews with facility managers of over 750 facilities. The inventory
<br /> of non-domestic wastewater sources collected in this study will be used to determine additional non-domestic
<br /> discharges that should be internally permitted and regulated. The project also includes quarterly wastewater
<br /> sampling efforts to collect both grab and 24-hour composite samples from WWTP influent locations on the
<br /> Hickam Field flight line and Pearl Harbor, as well as effluent samples from the WWTP. Fee: $1,154,918. Role:
<br /> Staff Civil Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Asbestos and Lead Paint Survey for Singapore Area PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Coordinator,Sembawang,Singapore Ongoing -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b. E2 is conducting an Asbestos Containing Material (ACM) survey, lead-based paint(LBP) inspection including an
<br /> LBP risk assessment (LRA) and lead content soil samples for unaccompanied housing facilities and lead dust
<br /> sampling for lodging units in Sembawang, Singapore. Responsibilities include sampling for ACM and LBP,
<br /> thoroughly documenting all field work activities with notes and photography, and preparing computer aided
<br /> design (CAD) drawing figures. Fee: $1,858,355. Role: Staff Engineer/Asbestos Inspector.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Biosolids Handling and Disposal Plan,Pacific Missile PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Range Facilities,Wastewater Treatment Plant,Kauai Ongoing -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Conducted a site investigation and sampling at the Pacific Missile Range Facility (PMRF), Kekaha, Kauai, Hawaii.
<br /> C• The study included various components of the wastewater treatment systems throughout the Base, with a focus
<br /> on the existing wastewater treatment plant (WWTP), individual wastewater system (IWS) facilities, sludge
<br /> drying beds, and the wastewater oxidation pond (WOP). E2 evaluated the current biosolids handling practices
<br /> and will develop a long-term plan for the proper treatment and disposal of biosolids at PMRF, including IWS
<br /> septage,WWTP and WOP sludge.Fee: $128,895. Role: Staff Civil Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Asbestos Survey,Naval Base Guam,Guam PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Ongoing -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Completed an asbestos survey of 109 buildings with a total survey area of 1,014,904 square feet at NBG for the
<br /> d. NAVFAC Pacific. E2 prepared a Work Plan (WP) and Health and Safety Plan (HSP) prior to field work.A total of 7,134
<br /> bulk samples were collected by a team of 4 inspectors, over four mobilizations within a year. E2 prepared Draft and
<br /> Final survey reports that included a summary table of findings, plans with approximate locations of samples taken,
<br /> extent of most HAs, a closeup and panoramic photo log of samples, and laboratory reports. Responsibilities included
<br /> preparation of the WP and HSP, coordination of field work, field work, and preparation the Draft and Final Survey
<br /> Reports.Fee: $1,065,234.Role: Staff Civil Engineer/Asbestos Inspector.
<br /> COUNTY OF HAWAII-FY24- PAGE 19
<br />
|