Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Joshua B.Agpaoa,E.I.T. Staff Civil Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 5 5 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, University of Hawaii at • Certified Asbestos Inspector, HIASB-4791 <br /> Manoa • Certified Risk Assessor/Lead Inspector, PB-1137 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • OSHA Initial HAZWOPER Training, 40-HR • OSHA Construction Safety and Health Training, 30-HR <br /> • OSHA Refresher Training,8-HR • Bloodborne Pathogens, First Aid, CPR,and AED Training <br /> 18.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Non-Domestic Wastewater Management Plan,JBPHH, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Oahu,Hawaii Ongoing - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify, characterize, and quantify non-domestic wastewater <br /> discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment Plant (WWTP). <br /> a. Coordinated site visits to and conducted interviews with facility managers of over 750 facilities. The inventory <br /> of non-domestic wastewater sources collected in this study will be used to determine additional non-domestic <br /> discharges that should be internally permitted and regulated. The project also includes quarterly wastewater <br /> sampling efforts to collect both grab and 24-hour composite samples from WWTP influent locations on the <br /> Hickam Field flight line and Pearl Harbor, as well as effluent samples from the WWTP. Fee: $1,154,918. Role: <br /> Staff Civil Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Asbestos and Lead Paint Survey for Singapore Area PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Coordinator,Sembawang,Singapore Ongoing - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b. E2 is conducting an Asbestos Containing Material (ACM) survey, lead-based paint(LBP) inspection including an <br /> LBP risk assessment (LRA) and lead content soil samples for unaccompanied housing facilities and lead dust <br /> sampling for lodging units in Sembawang, Singapore. Responsibilities include sampling for ACM and LBP, <br /> thoroughly documenting all field work activities with notes and photography, and preparing computer aided <br /> design (CAD) drawing figures. Fee: $1,858,355. Role: Staff Engineer/Asbestos Inspector. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Biosolids Handling and Disposal Plan,Pacific Missile PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Range Facilities,Wastewater Treatment Plant,Kauai Ongoing - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Conducted a site investigation and sampling at the Pacific Missile Range Facility (PMRF), Kekaha, Kauai, Hawaii. <br /> C• The study included various components of the wastewater treatment systems throughout the Base, with a focus <br /> on the existing wastewater treatment plant (WWTP), individual wastewater system (IWS) facilities, sludge <br /> drying beds, and the wastewater oxidation pond (WOP). E2 evaluated the current biosolids handling practices <br /> and will develop a long-term plan for the proper treatment and disposal of biosolids at PMRF, including IWS <br /> septage,WWTP and WOP sludge.Fee: $128,895. Role: Staff Civil Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Asbestos Survey,Naval Base Guam,Guam PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Ongoing - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Completed an asbestos survey of 109 buildings with a total survey area of 1,014,904 square feet at NBG for the <br /> d. NAVFAC Pacific. E2 prepared a Work Plan (WP) and Health and Safety Plan (HSP) prior to field work.A total of 7,134 <br /> bulk samples were collected by a team of 4 inspectors, over four mobilizations within a year. E2 prepared Draft and <br /> Final survey reports that included a summary table of findings, plans with approximate locations of samples taken, <br /> extent of most HAs, a closeup and panoramic photo log of samples, and laboratory reports. Responsibilities included <br /> preparation of the WP and HSP, coordination of field work, field work, and preparation the Draft and Final Survey <br /> Reports.Fee: $1,065,234.Role: Staff Civil Engineer/Asbestos Inspector. <br /> COUNTY OF HAWAII-FY24- PAGE 19 <br />