Laserfiche WebLink
concrete, soil gas, and harbor sediment at the site; and in impacted soil, <br /> groundwater, and/or harbor sediment brought to the surface during 2023 ACEC HAWAII <br /> construction/dredging activities at the site. ENGINEERING <br /> E2 also completed hazardous materials surveys for five UHMC buildings to be EXCELLENCE AWARD <br /> demolished, prepared reports, and assisted in the preparation of plans and <br /> specifications for the management of these materials during construction. <br /> Project Challenges and How They Were Overcome: <br /> • Detailed research into the historical uses at the site was critical in identifying potential environmental <br /> concerns at the site. <br /> • E2 was required to differentiate environmental conditions attributable to previous and current <br /> tenants. <br /> • E2 completed the Phase I and II ESAs and the EHE/EHMP on an accelerated schedule to accommodate <br /> the HDOT-Harbors design and planning timeline. <br /> How Successes or Lessons Learned Can Apply to This Contract: <br /> • The project included consultation with several government agencies and design consultants. <br /> • The Work Plan and EHE/EHMP were reviewed and approved by the HDOH,who had regulatory <br /> oversight of the project. <br /> • In addition, detailed research into the historical uses was critical in identifying potential <br /> environmental concerns at the site. <br /> Cost: $568,200. <br /> 23. FIRMS INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br /> a. Element Environmental,LLC Aiea,HI Contractor <br /> COUNTY OF HAWAII-FY24- PAGE 30 <br />