Laserfiche WebLink
• Soil and Groundwater Remediation <br /> • Landfill/Solid Waste: Permitting; Gas and Groundwater Monitoring, Reporting, and SIs; Fire Management; <br /> and Global Positioning System (GPS) Services <br /> • Integrated Solid Waste Management Planning <br /> • Underground Storage Tank(UST) Closures and Remedial Investigations <br /> • Dredged Material Testing and Evaluation <br /> • Water Quality Studies (including National Pollutant Discharge Elimination System [NPDES] Permitting and <br /> Monitoring) <br /> • Storm Water and Non-Point Source Pollutant Discharges <br /> • Environmental Assessments (EAs) and Environmental Impact Statements (EISs) <br /> • Environmental Permitting <br /> • Environmental Baseline Surveys (EBSs) <br /> • Risk Assessments <br /> • Biosolids Treatment and Composting <br /> • Phytoremediation and Mycoremediation <br /> • Geographic Information System (GIS)-based Mapping and Databases for Environmental Data <br /> Utilities Services <br /> • Design of Water Distribution,Transmission,and Treatment Systems <br /> • Design of Wastewater Collection,Treatment,and Disposal Systems <br /> • Design of Storm Drainage Collection and Disposal Systems <br /> Water Resources Services <br /> • Water Resource Planning <br /> • Well Site Selection <br /> • Hydrologic and Hydrogeologic Studies <br /> • Well Design and Permitting <br /> • Well Installation, Cleaning,Testing, Inspection,and Closure <br /> • Groundwater Monitoring <br /> • Groundwater Modeling <br /> COUNTY OF HAWAII - PROJECT EXAMPLES <br /> Below is a summary table of professional services provided to the County of Hawaii. <br /> Project Year Contract Description <br /> Completed Amount <br /> County of Hawaii - Wastewater Treatment Plants <br /> Kealakehe Wastewater E2 is currently preparing a Feasibility Study for the <br /> Treatment Plant Ongoing $394,800 Kealakehe Wastewater Treatment Plant to support <br /> Feasibility Study, Kona the United States Bureau of Reclamation Title XVI <br /> Program funding. <br /> Kealakehe Wastewater E2 collected 30 bulk samples for asbestos and 15 <br /> Treatment Plant 2022 $20,391 paint chip samples for lead, conducted a field <br /> Headworks Upgrade, investigation, and reviewed as-built plans and other <br /> Kona available previous survey reports. Prepared report. <br /> Pua Pump Station at Hilo E2 conducted historical research, reviewed records, <br /> Wastewater Treatment 2022 $19,420 and conducted a site inspection of the Kealakehe <br /> Plant Hazardous Materials Wastewater Treatment Plan. E2 also prepared a <br /> COUNTY OF HAWAII-FY24- PAGE 42 <br />