Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Ryan S.W.Yamauchi,P.E. Principal Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 31 18 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Mstr., Civil/Environmental Engineering, UC Berkeley • Professional Engineer, Hawaii- Civil No.9566 <br /> B.S., Civil Engineering, University of Hawaii at Manoa • Certified Asbestos Inspector, HIASB-2905 <br /> • Certified Lead Risk Assessor/Inspector, PB-0117 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • OSHA Initial HAZWOPER Training, 40-HR • Construction Safety Hazard Awareness Training for <br /> • OSHA Refresher Training,8-HR Contractors, 40-HR <br /> • OSHA Construction Safety and Health Training, 30- • Hazardous Waste Site Supervisor Training <br /> HR • Bloodborne Pathogens, First Aid, CPR,and AED Training <br /> 18.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kaneohe Bay No.2 Wastewater Pump Station Force Main PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Improvements,Kaneohe,Oahu,Hawaii 2017 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Design alternatives analysis for the replacement of the existing 14-inch force main.Alternatives analyzed <br /> a. included horizontal directional drilling, pilot tube microtunneling, and open-cut trenching the new alignment <br /> across an existing waterway. Completed design drawings and specifications for the selected alternative, <br /> horizontal directional drilling. Prepared the Engineering Design Alternatives Report, completed design <br /> calculations for the pumps and force main design, prepared design drawings and specifications, and other <br /> necessary permit documents. Fee: $520,000. Role: Project Manager/Principal Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Reconstruction/Replacement of Sewers,Ho'omaluhia PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Botanical Gardens,Kaneohe,Oahu,Hawaii Ongoing - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Completed planning,design, and preparation of construction documents for the reconstruction/replacement of <br /> b <br /> ' existing sewer lines. Phase I included the cleaning and inspection of CCTV in accordance with the Pipeline <br /> Assessment Certification Program. Phase II assessed the sewer line deficiencies from the CCTV data, developed <br /> rehabilitation/replacement alternatives for the system, prepared schematic and concept drawings for the <br /> recommended alternatives, and prepared a cost estimate for the recommended improvements. E2 is preparing <br /> construction documents for phase III. Fee: $165,350. Role: Project Manager/Principal Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Large Capacity Cesspool Closures Hickam Field,Joint Base PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Pearl Harbor-Hickam,Oahu,Hawaii 2015 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> c. Completed an engineering design for five facilities' active cesspools. Three of the cesspool facilities were <br /> replaced with a septic tank, pump station, and raised leach field. Two of the cesspools were replaced with <br /> pump stations that pump wastewater to the existing wastewater collection system. Evaluated present and <br /> future wastewater flows, sizing and selecting new septic tanks, pump stations, and leach fields, and completed <br /> construction documents. Fee: $362,372. Role: Project Manager/Principal Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimanalo Wastewater Treatment Plant Effluent Reuse PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Feasibility Study,Waimanalo,Oahu,Hawaii 2014 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> d Conducted a study to assess the technical, environmental, and economic feasibility of wastewater effluent reuse <br /> from the Waimanalo Wastewater Treatment Plant. Responsible for the identification of potential users and <br /> locations, including the reuse demand, and transmission and storage requirements. Tasks included public outreach, <br /> data collection, research of prior studies, and evaluation of costs. Prepared a conceptual layout and cost estimate for <br /> the preferred WWTP upgrades and transmission and storage requirements for users with strong interest in reuse. <br /> Fee: $219,345. Role: Project Manager/Principal Engineer. <br /> "' COUNTY OF HAWAII-FY24- PAGE 2 <br />