|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Roger C.Aoki, P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 27 17
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Mstr., Civil Environmental Engineering, Purdue • Professional Engineer, Hawaii- Civil No. 10019
<br /> University • Certified Asbestos Inspector, HIASB-2902
<br /> B.S., Civil Engineering,University of Hawaii at Manoa • Certified Lead Inspector, PB-0118
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA Initial HAZWOPER Training, 40-HR • 40-hour Construction Safety Hazard Awareness Training
<br /> • OSHA Refresher Training, 8-HR for Contractors
<br /> • OSHA Construction Safety and Health Training, 30- • Hazardous Waste Site Supervisor Training
<br /> HR • Bloodborne Pathogens, First Aid, CPR, and AED Training
<br /> 18.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Site Investigation,Abandoned AVGAS/MOGAS Pipeline, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Pearl City Peninsula,JBPHH,Oahu,Hawaii 2016 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Conducted a Site Investigation for the abandoned aviation gasoline (AVGAS) and motor gasoline (MOGAS)
<br /> a. pipeline running from the former Pearl City Fuel Annex to the waterfront fueling and cargo wharves on Pearl
<br /> City Peninsula within JBPHH. Delineated and characterized the nature and extent of contamination in the soil,
<br /> groundwater, and soil gas caused by historic releases of AVGAS/MOGAS, conducted an environmental hazard
<br /> evaluation, and to provide a basis for developing effective remedial measures and response actions for the area.
<br /> Fee: $375,000. Role: Project Manager/Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Stormwater Drainage System Survey,JBPHH,and PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Outlying Areas,Oahu,Hawaii 2016 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> b. Created an integrated, scaled, and detailed storm drainage map and database. The maps and results of the
<br /> survey were used to determine areas in need of repair or cleaning. Conducted a survey and condition
<br /> assessment of all storm drain features, and in specified situations, sediment sampling and analysis, to create a
<br /> detailed base-wide storm drainage map and database. Fee: $1,799,119. Role: Project Manager/Senior
<br /> Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Pier 29 Container Yard Improvements,Honolulu Harbor, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu,Oahu,Hawaii 2012 2012
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Prepared design specifications for the handling of contaminated soil and groundwater to be encountered during
<br /> c' the construction. The improvements include a new pavement structure to accommodate a new container yard.
<br /> E2 prepared design specifications to address air monitoring during construction and the removal of abandoned
<br /> fuel pipelines encountered. E2 participated in coordination meetings with the Harbors Division and the IDPP.
<br /> E2 also addressed comments by HDOH who reviewed the construction documents. Fee: $30,340. Role: Senior
<br /> Environmental Engineer. *COMMENDATION LETTER-EXCELLENT PERFORMANCE*
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kalewa Wastewater Pump Station Improvements Design PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu,Oahu,Hawaii 2018 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Completed an engineering design of a new packaged wastewater pump station and new dual relief force main
<br /> e' for the Kalewa Street wastewater pump station. Evaluated present and future wastewater flows from the
<br /> tributary, sizing and selecting the new packaged pump station, and completed construction documents for the
<br /> new packaged wastewater pump station and new dual relief force main. Integral to the design was planning the
<br /> phasing of construction, which would allow continued and uninterrupted use of the airport facilities by the
<br /> tenants during construction. Fee: $52,000. Role: Senior Environmental Engineer.
<br /> COUNTY OF HAWAII-FY24- PAGE 3
<br />
|