Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Roger C.Aoki, P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 27 17 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Mstr., Civil Environmental Engineering, Purdue • Professional Engineer, Hawaii- Civil No. 10019 <br /> University • Certified Asbestos Inspector, HIASB-2902 <br /> B.S., Civil Engineering,University of Hawaii at Manoa • Certified Lead Inspector, PB-0118 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • OSHA Initial HAZWOPER Training, 40-HR • 40-hour Construction Safety Hazard Awareness Training <br /> • OSHA Refresher Training, 8-HR for Contractors <br /> • OSHA Construction Safety and Health Training, 30- • Hazardous Waste Site Supervisor Training <br /> HR • Bloodborne Pathogens, First Aid, CPR, and AED Training <br /> 18.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Site Investigation,Abandoned AVGAS/MOGAS Pipeline, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Pearl City Peninsula,JBPHH,Oahu,Hawaii 2016 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Conducted a Site Investigation for the abandoned aviation gasoline (AVGAS) and motor gasoline (MOGAS) <br /> a. pipeline running from the former Pearl City Fuel Annex to the waterfront fueling and cargo wharves on Pearl <br /> City Peninsula within JBPHH. Delineated and characterized the nature and extent of contamination in the soil, <br /> groundwater, and soil gas caused by historic releases of AVGAS/MOGAS, conducted an environmental hazard <br /> evaluation, and to provide a basis for developing effective remedial measures and response actions for the area. <br /> Fee: $375,000. Role: Project Manager/Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Stormwater Drainage System Survey,JBPHH,and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Outlying Areas,Oahu,Hawaii 2016 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> b. Created an integrated, scaled, and detailed storm drainage map and database. The maps and results of the <br /> survey were used to determine areas in need of repair or cleaning. Conducted a survey and condition <br /> assessment of all storm drain features, and in specified situations, sediment sampling and analysis, to create a <br /> detailed base-wide storm drainage map and database. Fee: $1,799,119. Role: Project Manager/Senior <br /> Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pier 29 Container Yard Improvements,Honolulu Harbor, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu,Oahu,Hawaii 2012 2012 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Prepared design specifications for the handling of contaminated soil and groundwater to be encountered during <br /> c' the construction. The improvements include a new pavement structure to accommodate a new container yard. <br /> E2 prepared design specifications to address air monitoring during construction and the removal of abandoned <br /> fuel pipelines encountered. E2 participated in coordination meetings with the Harbors Division and the IDPP. <br /> E2 also addressed comments by HDOH who reviewed the construction documents. Fee: $30,340. Role: Senior <br /> Environmental Engineer. *COMMENDATION LETTER-EXCELLENT PERFORMANCE* <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kalewa Wastewater Pump Station Improvements Design PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu,Oahu,Hawaii 2018 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Completed an engineering design of a new packaged wastewater pump station and new dual relief force main <br /> e' for the Kalewa Street wastewater pump station. Evaluated present and future wastewater flows from the <br /> tributary, sizing and selecting the new packaged pump station, and completed construction documents for the <br /> new packaged wastewater pump station and new dual relief force main. Integral to the design was planning the <br /> phasing of construction, which would allow continued and uninterrupted use of the airport facilities by the <br /> tenants during construction. Fee: $52,000. Role: Senior Environmental Engineer. <br /> COUNTY OF HAWAII-FY24- PAGE 3 <br />