Laserfiche WebLink
County of Hawai'i <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm <br /> Scope: In partnership with the City of New Orleans and Rockefeller Foundation (100RC), John completed analyses <br /> and facilitated workshops that evaluated the right mix of green and grey infrastructure and financial mechanisms to <br /> pay and maintain improvements. Analysis considered level of service, implementation period and included evaluation <br /> of a blend of millage, stormwater user fees, fee-in-lieu-of, tourism taxes, and external grant funding to pay for selected <br /> plan. The project has now evolved into detailed design of blue-green infrastructure. •Size: N/A• Cost: $6.5M • Role: <br /> Resilience Technical SME <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> "London 2100"Water Strategic Plan (London, United Kingdom) PROFESSIONAL CONSTRUCTION(If applicable) <br /> SERVICES N/A <br /> Ongoing <br /> d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Scope: John and the Stantec team helped Thames Water District facilitate the design of a community-based (year— <br /> 2100)vision for water. London's water infrastructure, which is approaching 200-years old, is being revisited to identify <br /> strategies for meeting increased demand because of projected four-fold population growth. The vision includes <br /> separating storm and sanitary systems, harvesting rain-water, gray water industrial reuse supported by innovative, <br /> and sustainable funding strategies. •Size: N/A• Cost: $1.7M • Role: Resilience Global SME <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Tottenville Beach Recovery and Restoration PROFESSIONAL CONSTRUCTION(If applicable) <br /> (Staten Island, NY) SERVICES N/A <br /> Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm <br /> e. Scope: This HUD sponsored Rebuild by Design project strives to stabilize shoreline, reduce coastal flood risk, and <br /> protect the local economy. John and the Stantec team's resilient solution currently under design includes integrated <br /> living shorelines, elevated walking trails, green infrastructure, ecosystem restoration and matrix of natural and <br /> reinforced sand dunes. Scope: Resiliency planning, Living shorelines/wetlands/shoreline protection, Civil <br /> engineering/stormwater management and modeling, Coastal berms/landscaping, Elevated roads and pathways, <br /> Community outreach, Multi-federal agency coordination, HUD grant administration, and Flood risk reduction • Size: <br /> Staten Island • Cost: N/A• Role: Technical Advisor <br /> STANDARD FORM 330 (REV. 7/2021) PAGE <br />