My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005739 06.30.23 STANTEC CAT PL.3, PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005739 06.30.23 STANTEC CAT PL.3, PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2023 3:12:18 PM
Creation date
8/29/2023 9:29:13 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005739
Description
STANTEC, PROFESSIONAL SERVICES FOR CAT PL.3, PL.4, PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawai'i <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Sarah Troedson, GISP Senior GIS Analyst a.TOTAL b.WITH CURRENT FIRM <br /> 25 4 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Stantec Consulting Services Inc. (Thousand Oaks, CA) <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Master of Geographic Information Systems Certified Geographic Information Systems Professional <br /> BS, Geology (GISP)#58500 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Memberships: North American Cartographic Information Society, Urban and Regional Information Systems Association <br /> (URISA), Women in GIS <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hawaii Green Growth Ala Wai Watershed Collaboration PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2020 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. <br /> Scope: This project was conducted to support the development of a Holistic Ala Wai Watershed Management <br /> Plan for Growth in partnership with UH Sea Grant and the Waikiki Beach Special Improvement District Association. <br /> The plan addresses six priority issues for the watershed: stormwater flood risk; ecological restoration and <br /> protection; storm surge and sea level rise; hurricane, climate, and disaster resilience; improvements of recreation <br /> spaces; uplift and restore cultural sites and practices. • Size: N/A• Cost: $9K • Role: Senior GIS Analyst <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Maui and Molokai Dam Safety Inspections Phase I (Maui and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Molokai Islands, HI) 2013 N/A <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm <br /> Scope: Responsible for gathering current and historic seismic data to create maps of seismic activity within 100km <br /> of multiple dams on the islands of Maui and Molokai, as well as producing geologic maps and location maps for <br /> field staff and for reports. • Size: N/A •Cost: $50K • Role: Senior GIS Analyst <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lahaina Watershed Flood Management Project (Lahaina, HI) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> c. <br /> Scope: The Lahaina Watershed Flood Management Project requires the development of a Natural Resource <br /> Conservation Service (NRCS), NEPA, and HEPA compliant Supplemental Plan Environmental Document (ED) to <br /> evaluate watershed protection and management measures within the Lahaina Watershed. The proposed project is <br /> intended to mitigate for flooding and reduce the impacts of sedimentation in the nearshore marine environment. • <br /> Size: 5,250 acres • Cost: $1.4M • Role: Senior GIS Analyst <br /> STANDARD FORM 330 (REV. 7/2021) PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.