Laserfiche WebLink
County of Hawai'i <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> a.TOTAL b.WITH CURRENT FIRM <br /> Benjamin Berridge, AICP, PMP Environmental Planner 13 8 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Stantec GS Inc. (Honolulu, HI) <br /> Stantec GS Inc.is owned and operated by Stantec Consulting Services Inc. through an internal affiliated operations plan. <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE <br /> BA, Environmental Studies Project Management Professional, Project Management Institute <br /> Certified Planner#384544, American Planning Association, American Institute <br /> of Certified Planners <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Memberships: American Planning Association, Hawaii Chapter, Association of Environmental and Health Sciences <br /> Foundation <br /> Additional Training/Certifications: Project Management Professional (PMP) Boot Camp, Batelle Memorial <br /> Institute/Coastal Marine Spatial Planning Advanced Training Certificate <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> City and County of Honolulu NPDES MS4 Monitoring (Honolulu, PROFESSIONAL CONSTRUCTION(If applicable) <br /> HI) SERVICES N/A <br /> Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Scope: Managed all Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination <br /> system (NPDES) permit required monitoring and reporting for the City and County of Honolulu, Storm Water Branch. <br /> a. Managed collection of storm water samples at 75 industrial facilities throughout the island of Oahu. Duties included <br /> investigating, planning and installation of remote water quality and atmospheric monitoring stations to collect first- <br /> flush storm water samples according to 40 CFR 136 and EPA guidelines. Provided QA/QC oversight of telemetered <br /> monitoring stations incorporating data logged by automated sampling equipment, water quality sensors, as well as <br /> area-velocity sensors and pressure transducers providing continual flow records and site conditions. Also, <br /> tracked/archived weather, coordinated 24/7 on-call teams for grab/composite sample collection, maintained rainfall- <br /> runoff curves and monitored automated sampling equipment. • Size: N/A • Cost: $462K (2022) • Role: Project <br /> Manager/Environmental Planner <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Environmental Monitoring Services for Geothermal Energy PROFESSIONAL CONSTRUCTION(If applicable) <br /> Conversion Plant, Puna Geothermal Venture (Pahoa, HI) SERVICES N/A <br /> Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b Scope: Providing environmental monitoring services to Puna Geothermal Venture, in Pahoa, Hawaii. Services <br /> include meteorology, noise, air quality, and groundwater monitoring as required by Geothermal Resource, <br /> Underground Injection Control, and Noncovered Source Permits from the State of Hawaii Department of Health <br /> (DOH). Manages data collection (EDAS), conducts QA/QC process for daily air quality reports, and authors semi- <br /> annual hydrological monitoring reports and monthly noise, meteorological, and air quality monitoring reports. Field <br /> activities include semi-annual groundwater sampling and calibration of meteorological monitoring equipment. • Size: <br /> N/A• Cost: $2.4M • Role: Program Manager/Environmental Planner <br /> STANDARD FORM 330 (REV. 7/2021) PAGE <br />