Laserfiche WebLink
County of Hawai'i <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> a.TOTAL b.WITH CURRENT FIRM <br /> Bert Weeks Marine Biologist 7 2 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Stantec GS Inc. (Honolulu, HI) <br /> Stantec GS Inc.is owned and operated by Stantec Consulting Services Inc. through an internal affiliated operations plan. <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE <br /> AND DISCIPLINE) <br /> Master of Advanced Studies/Marine Biodiversity and Conservation <br /> BS, Biology N/A <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Memberships: National Association of Environmental Professionals <br /> Certifications and Training: AAUS Science Diver <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Stormwater Monitoring and MS4 NPDES Permit Related Services PROFESSIONAL CONSTRUCTION(If applicable) <br /> for the City and County of Honolulu 2022 (Honolulu, HI) SERVICES N/A <br /> 2022 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Scope: Providing support to CY22 stormwater monitoring services for National Pollutant Discharge Elimination <br /> a. System (NPDES). Project is to monitor and maintain nine (9) rain gauges across the island of Oahu in support of <br /> stormwater runoff sampling from City-operated industrial facilities. The key project goal is support of NPDES permit <br /> compliance for these facilities. Implements stormwater sampling during qualifying storm events and submission of <br /> water samples to laboratory facilities for further analyses in support of NPDES permit compliance. Drafts Storm <br /> Event Summary Reports and water sample compositing and field water quality grab parameter analysis after each <br /> storm event. Assists in completion of twice weekly weather tracking and archiving of forecasts, annual compilation of <br /> a sample location photo log, and an annual report summarizing findings. • Size: N/A • Cost: $462K • Role: <br /> Environmental Scientist/Biologist <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Environmental Impact Statement for Pearl Harbor Naval Shipyard PROFESSIONAL CONSTRUCTION(If applicable) <br /> and Intermediate Maintenance Facility Dry Dock and Waterfront SERVICES N/A <br /> Production Facility at JBPHH (Oahu, HI) 2023 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Scope: Providing support for an EIS evaluating improvements, repairs, and/or new construction in support of JBPHH <br /> b submarine dry dock and dry dock facility infrastructure with four alternatives and a no action alternative. Project has <br /> an aggressive time line for completion (two years). Ongoing work includes completion of the State of Hawaii DOH <br /> Water Quality Certification, Compensatory Mitigation Plan, and the USACE individual permit. The proposed project's <br /> construction-related actions include dredging, fill, pile driving, installation of new temporary and permanent in-water <br /> structures, demolition of existing landside structures, and construction of new temporary and permanent landside <br /> facilities. The EIS evaluated impacts to five alternatives with various support facility options and 16 resources areas <br /> including dredging and filling within a Superfund remedial action area and demolishing existing historic structures. <br /> There are three cooperating agencies including USACE, USEPA, and NMFS. •Size: 176,800 SF Dry Dock and <br /> Waterfront Production Facility; 2,800-acre area • Cost: $7.1M • Role: Marine Biologist/Environmental Scientist <br /> STANDARD FORM 330 (REV. 7/2021) PAGE <br />