Laserfiche WebLink
DARROW:Sure. The issues that are brought by Mr. Parazette are mainly dealt <br />with at the time of Plan Approval; and, you know, he brings up a lot of issues regarding <br />parking, and those will all be dealt with at the time of Plan Approval when they come in. <br />There€s a, you know, as far as the different, the size of the building, they€re going to need <br />to be able to address the -. Once, if there is a change in the type of uses that occur, like <br />Mr. Parazette is talking about a change between Industrial versus Commercial that will be <br />looking at a different square footage in regards to parking, that will be something that <br />would need to be re-addressed. I would think that at this time if the building is under <br />construction, it has already come before Plan Approval. So that€s something that will <br />need to be addressed in regards to the change in uses. <br />FUKE:That is correct. Plan Approval was issued by the Planning <br />Department, and that is the only way that you can get your building permit. And when <br />the Plan Approval was issued, it was predicated upon one stall for every 400 square feet. <br />NotallIndustrialuseswithintheMLzonecallsforlikeonestallforevery400square <br />feet. For example, if you have like warehouse space, the stall requirement is one stall for <br />every 1,000 square feet. On the other hand, if you have like a medical office or a retail <br />establishment, then the stall requirement changes one stall for every 300 square feet. So <br />this is what Mr. Parazette is raising about. And so what I mentioned earlier is that when <br />you, this is just a shell. So any use that occupies a portion of it, you need to have like <br />interior permits coming in; and prior to issuance of that, you need to have Plan Approval <br />according to the Code. And when you do that then the specific uses become articulated <br />and the Planning Department then would say, well, you know, you€ve got x‚ number of <br />stalls on the property and so this is how much, you know, you€ll be allocated for this <br />particular use; and then you€ll find out like what the balance is. And if in the end, you <br />know, the last user comes in and there€s not enough parking, then the Applicant would be <br />limited in terms of what kind of use can then enter into the project, or find the alternative <br />parking within a 1,000-foot radius. <br />SIRACUSA:Thank you for clarifying that. Director, you€re ready? <br />YUEN:Well, what I said is basically correct. I also want, you also lose <br />some uses when you go from ML to MCX. Generally, some of the things that would be <br />more Light Industrial in nature you lose the possibility of airfields, airports and private <br />landing strips, animal quarantine stations, automobile-truck storage facilities. Bakeries <br />are in there now I think in MCX. So generally MCX is, you know, without going <br />through the list completely, MCX is more favorable for commercial, retail and office <br />types of uses; and ML is more favorable for a broader range of Light Industrial types of <br />uses. <br />SIRACUSA:Okay. I just wanted to state that the reason I was asking these <br />questions is because already we haven€t even started and we€ve lost one of the proposed <br />uses, and that being the dialysis center. And, of course, once the Change of Zone goes <br />through, then it€s a done deed. So I wanted to know what other things could be expected <br />if there are more changes, such as if those doctors decide, you know, over a period of <br />time not to renew leases or whatever, something else happens. Thank you. <br />5EXHIBIT A <br /> <br />