Laserfiche WebLink
time the survey was done I was down to 6.4 acres. I’m not exactly sure where that went. But <br />that’s I think part of the confusion of the survey and why there’s a discrepancy. The survey is <br />accurate. We received that in April of last year. In February of last year when I knew the survey <br />was coming, much of what I was doing was waiting for the survey. It took over three years with <br />a lot of conditions. For example a survey was one of them. And when we had, when I knew the <br />survey was going to come, I contacted Jen and these guys and wanted to strategize how best to <br />go back to the Commission, and what are we, and what do we need to be, to combine all these <br />things that we do. <br />ZELKO: Yeah, actually for the survey if you want to take a look at it, it should be <br />as Exhibit E that was in our background report. It may seem confusing. It’s under the <br />archaeological report. Rechtman Consulting who did the inventory survey and stated that there <br />were no sites on this property does have a copy of the survey. So it’s, let’s see, Exhibit E on <br />page 5, page 4. When they initially purchased the property their deed actually says 7.8 acres. <br />And it wasn’t until after they survey was done that they, and as is the way in Kau they had lost <br />over an acre at that point. <br />WOODWARD: All right. I have one question with regard to this survey. There are no <br />structures on the survey. It’s just a boundary map. Is there a survey that shows where the <br />structures are? <br />ZELKO: No. This survey actually was done because we needed to get an <br />archaeological inventory done; and so in order for the archaeologist to know the boundary lines <br />we had to have this done. So this wasn’t done as a site plan. This really was done to get the <br />archaeological inventory that the previous Planning Commission had requested that we do. <br />WOODWARD: All right. Thank you. Any other questions? Commissioner Kern. <br />KERN: Thank you, Mr. Chairman. When you folks purchased the property was <br />there any existing structures on it? <br />MCKINNEY: There were none. There were a couple fence lines that were relatively <br />inaccurate as we now know. <br />KERN: Okay. Are there any permitted structures on there currently now? <br />MCKINNEY: No. <br />KERN: No. So there is approximately 11 plus structures unpermitted? <br />MCKINNEY: A majority of the structures are under six feet. I believe there are only <br />five unpermitted structures that we do need to get permitted. <br />KERN: So just out of curiosity, you were deferred, you deferred action on it and <br />basically said, well, we’re just going to go ahead and do it anyways and see what we’re going to <br />deal with later? I mean -. <br />7 <br /> EXHIBIT B <br /> <br />